CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping

被引:0
|
作者
Lucas Grèze
Robert Pellerin
Patrice Leclaire
Nathalie Perrier
机构
[1] École Polytechnique de Montréal,Jarislowsky/SNC
[2] LISMMA,Lavalin Research Chair in the Management of International Projects, Department of mathematics and industrial engineering
[3] SUPMECA,undefined
来源
关键词
Activity overlapping; Concurrent engineering; Project management; Project scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
The overlapping of activities is a common practice to accelerate the execution of engineering projects. This technique consists in executing in parallel two activities, normally executed in a sequential way, by allowing the downstream activity to start before the end of the upstream activity based on preliminary information. In this paper, we propose a constructive heuristic for the resource-constrained project scheduling problem with overlapping modes (RCPSP-OM). Given a set of activities to execute, the RCPSP-OM consists in determining the order of execution in time of a set of activities so as to minimize the total project duration, while respecting precedence relations, resource constraints and overlapping possibilities. The heuristic implies that rework tasks related to overlapping are added to downstream activities and that the consumption of the resources is constant throughout the execution of the project (including rework). The method also considers that the possible overlapping modes for every couple of activities and the duration of rework tasks associated with every mode are known in advance. Results show that, when the objective consists in minimizing the project duration, the consideration of the costs associated to activity overlapping allows to significantly reducing the cost of reworks. On the other hand, when the objective consists in maximizing the gains related to the project execution, the search for the best trade-off between acceleration and increase of project costs enables to avoid losses.
引用
收藏
页码:797 / 811
页数:14
相关论文
共 50 条
  • [1] CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping
    Greze, Lucas
    Pellerin, Robert
    Leclaire, Patrice
    Perrier, Nathalie
    JOURNAL OF INTELLIGENT MANUFACTURING, 2014, 25 (04) : 797 - 811
  • [2] Resource-constrained project scheduling:: A critical activity reordering heuristic
    Valls, V
    Quintanilla, S
    Ballestín, F
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 282 - 301
  • [3] A NEW HEURISTIC SOLUTION METHOD IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BELL, CE
    HAN, J
    NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 315 - 331
  • [4] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [5] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [6] Research on resource-constrained project scheduling method based on heuristic priority rules
    Wang, Bing
    Chen, Tinggui
    Zhou, Guanglan
    Xu, Chonghuan
    Computer Modelling and New Technologies, 2014, 18 (01): : 143 - 150
  • [7] HEURISTIC PERFORMANCE AND NETWORK RESOURCE CHARACTERISTICS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (12) : 1145 - 1152
  • [8] A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling
    Pilar Tormos
    Antonio Lova
    Annals of Operations Research, 2001, 102 : 65 - 81
  • [9] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [10] A neural network based heuristic for resource-constrained project scheduling
    Shou, YY
    ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS, 2005, 3496 : 794 - 799