CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping

被引:0
|
作者
Lucas Grèze
Robert Pellerin
Patrice Leclaire
Nathalie Perrier
机构
[1] École Polytechnique de Montréal,Jarislowsky/SNC
[2] LISMMA,Lavalin Research Chair in the Management of International Projects, Department of mathematics and industrial engineering
[3] SUPMECA,undefined
来源
关键词
Activity overlapping; Concurrent engineering; Project management; Project scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
The overlapping of activities is a common practice to accelerate the execution of engineering projects. This technique consists in executing in parallel two activities, normally executed in a sequential way, by allowing the downstream activity to start before the end of the upstream activity based on preliminary information. In this paper, we propose a constructive heuristic for the resource-constrained project scheduling problem with overlapping modes (RCPSP-OM). Given a set of activities to execute, the RCPSP-OM consists in determining the order of execution in time of a set of activities so as to minimize the total project duration, while respecting precedence relations, resource constraints and overlapping possibilities. The heuristic implies that rework tasks related to overlapping are added to downstream activities and that the consumption of the resources is constant throughout the execution of the project (including rework). The method also considers that the possible overlapping modes for every couple of activities and the duration of rework tasks associated with every mode are known in advance. Results show that, when the objective consists in minimizing the project duration, the consideration of the costs associated to activity overlapping allows to significantly reducing the cost of reworks. On the other hand, when the objective consists in maximizing the gains related to the project execution, the search for the best trade-off between acceleration and increase of project costs enables to avoid losses.
引用
收藏
页码:797 / 811
页数:14
相关论文
共 50 条
  • [21] Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
    Chu, Zihao
    Xu, Zhe
    Xie, Fang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2019, 44 (03) : 2503 - 2517
  • [22] Multi-mode resource-constrained project scheduling problem with activities overlapping
    Chu Z.
    Xu Z.
    Yu J.
    Xu, Zhe (xuzhebuaa@163.com), 1600, CIMS (23): : 557 - 566
  • [23] Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
    Zihao Chu
    Zhe Xu
    Fang Xie
    Arabian Journal for Science and Engineering, 2019, 44 : 2503 - 2517
  • [24] A HYBRID GENETIC ALGORITHM FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH STOCHASTIC OVERLAPPING MODES
    Xie, Fang
    Yu, Jing
    Xu, Zhe
    ICIM2014: PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2014, : 286 - 289
  • [25] SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BOCTOR, FF
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) : 3 - 13
  • [26] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)
  • [27] Meta-heuristic Techniques to Solve Resource-Constrained Project Scheduling Problem
    Roy, Bidisha
    Sen, Asim Kumar
    INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING AND COMMUNICATIONS, VOL 2, 2019, 56 : 93 - 99
  • [28] Comparison of Heuristic Priority Rules in the Solution of the Resource-Constrained Project Scheduling Problem
    Turkakin, Osman Hurol
    Arditi, David
    Manisali, Ekrem
    SUSTAINABILITY, 2021, 13 (17)
  • [29] The electromagnetism meta-heuristic applied to the resource-constrained project scheduling problem
    Debels, Dieter
    Vanhoucke, Mario
    ARTIFICIAL EVOLUTION, 2006, 3871 : 259 - 270
  • [30] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations
    Csebfalvi, G.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94