Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting

被引:57
|
作者
Cheng, Junzilan [1 ]
Fowler, John [2 ]
Kempf, Karl [3 ]
Mason, Scott [4 ]
机构
[1] Arizona State Univ, Sch Comp Informat & Decis Syst Engn CIDSE, Ira A Fulton Sch Engn, Tempe, AZ 85281 USA
[2] Arizona State Univ, Dept Supply Chain Management, WP Carey Sch Business, Tempe, AZ 85287 USA
[3] Intel Corp, Decis Engn Grp, Chandler, AZ 85226 USA
[4] Clemson Univ, Dept Ind Engn, Clemson, SC 29634 USA
关键词
Resource-constrained project scheduling; Preemption; Calendarization; Activity splitting; BATCH SETUP TIMES; JOB RELEASE DATES; PREEMPTION PENALTIES; DELIVERY TIMES; MULTIPLE-MODES; ALGORITHM; MACHINE; CLASSIFICATION; HEURISTICS; ALLOCATION;
D O I
10.1016/j.cor.2014.04.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we explore the difference between preemption and activity splitting in the resource-constrained project scheduling problem (RCPSP) literature and identify a new set of RCPSPs that only allows non-preemptive activity splitting. Each activity can be processed in multiple modes and both renewable and non-renewable resources are considered. Renewable resources have time-varying resource constraints and vacations. Multi-mode RCPSP (MRCPSP) with non-preemptive activity splitting is shown to be a generalization of the RCPSP with calendarization. Activity ready times and due dates are considered to study the impact on project makespan. Computational experiments are conducted to compare optimal makespans under three different problem settings: RCPSPs without activity splitting (P1), RCPSPs with non-preemptive activity splitting (P2), and preemptive RCPSPs (P3). A precedence tree-based branch-and-bound algorithm is modified as an exact method to find optimal solutions. Resource constraints are included into the general time window rule and priority rule-based simple heuristics are proposed to search for good initial solutions to tighten bounding rules. Results indicate that there are significant makespan reductions possible when non-preemptive activity splitting or preemptions are allowed. The higher the range of time-varying renewable resource limits and the tighter the renewable resource limits are, the bigger the resulting makespan reduction can be. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:275 / 287
页数:13
相关论文
共 50 条
  • [31] Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem
    Elloumi, Sonda
    Loukil, Taicir
    Fortemps, Philippe
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2021, 167
  • [32] A robust optimization approach for the multi-mode resource-constrained project scheduling problem
    Balouka, Noemie
    Cohen, Izack
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) : 457 - 470
  • [33] An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    [J]. EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, PROCEEDINGS, 2009, 5482 : 85 - 96
  • [34] Optimizing time, cost and quality in multi-mode resource-constrained project scheduling
    Kannimuthu, Marimuthu
    Raphael, Benny
    Palaneeswaran, Ekambaram
    Kuppuswamy, Ananthanarayanan
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (01) : 44 - 63
  • [35] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Vincent Van Peteghem
    Mario Vanhoucke
    [J]. Journal of Heuristics, 2011, 17 : 705 - 728
  • [36] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    [J]. JOURNAL OF HEURISTICS, 2011, 17 (06) : 705 - 728
  • [37] The Multi-Mode Resource-Constrained Multi-Project Scheduling ProblemThe MISTA 2013 challenge
    Tony Wauters
    Joris Kinable
    Pieter Smet
    Wim Vancroonenburg
    Greet Vanden Berghe
    Jannes Verstichel
    [J]. Journal of Scheduling, 2016, 19 : 271 - 283
  • [38] Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling
    Chiang, Chuan-Wen
    Huang, Yu-Qing
    Wang, Wen-Yen
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2008, 19 (4-5) : 345 - 358
  • [39] An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 449 - 460
  • [40] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526