A robust optimization approach for the multi-mode resource-constrained project scheduling problem

被引:60
|
作者
Balouka, Noemie [1 ]
Cohen, Izack [2 ]
机构
[1] Technion, Fac Ind Engn & Management, IL-3200003 Haifa, Israel
[2] Bar Ilan Univ, Fac Engn, IL-5290002 Ramat Gan, Israel
关键词
Project management; Resource-constrained project scheduling; Robust scheduling; HEURISTIC PROCEDURES; GENETIC ALGORITHM; UNCERTAINTY; STRATEGIES; RCPSP;
D O I
10.1016/j.ejor.2019.09.052
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper suggests a robust optimization approach for the multi-mode resource-constrained project scheduling problem with uncertain activity durations. The objective is to minimize the worst-case project duration by deciding on activity modes, resource allocations and a schedule baseline. The problem is solved by a Benders decomposition approach with specialized cuts. We consider polyhedral uncertainty sets in which the level of conservatism can be adjusted. Using a computational study in which various problem instances are explored under varying levels of uncertainty, conservatism and several types of duration distributions, we provide insights about the price of robustness and the performance of the approach. The hope is that these insights can guide future multi-mode project scheduling implementations when there is partial information about the distribution of activity durations. (c) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:457 / 470
页数:14
相关论文
共 50 条
  • [1] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [2] Multi-mode resource-constrained project scheduling problem with alternative project structures
    Tao, Sha
    Dong, Zhijie Sasha
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 333 - 347
  • [3] Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with SMT
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. 2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 239 - 246
  • [4] An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
    Messelis, Tommy
    De Causmaecker, Patrick
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (03) : 511 - 528
  • [5] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    [J]. OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
  • [6] A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
    Bold, Matthew
    Goerigk, Marc
    [J]. OPERATIONS RESEARCH LETTERS, 2022, 50 (05) : 581 - 587
  • [7] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Alessandro Hill
    Eduardo Lalla-Ruiz
    Stefan Voß
    Marcos Goycoolea
    [J]. Journal of Scheduling, 2019, 22 : 173 - 182
  • [8] Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu
    Raphael, Benny
    Ekambaram, Palaneeswaran
    Kuppuswamy, Ananthanarayanan
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) : 893 - 916
  • [9] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Hill, Alessandro
    Lalla-Ruiz, Eduardo
    Voss, Stefan
    Goycoolea, Marcos
    [J]. JOURNAL OF SCHEDULING, 2019, 22 (02) : 173 - 182
  • [10] The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 119 (02) : 538 - 556