共 50 条
- [43] A Modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem [J]. 2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
- [45] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
- [47] A Continuous-Time MILP Formulation for the Multi-Mode Resource-Constrained Project Scheduling Problem [J]. 2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 452 - 456
- [50] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem [J]. IEEE ACCESS, 2020, 8 : 142269 - 142281