Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices

被引:0
|
作者
Peng, Wuliang [1 ]
Yu, Dongmin [1 ]
Xie, Fang [1 ]
机构
[1] Yantai Univ, Sch Econ & Management, Yantai 264005, Peoples R China
基金
中国国家自然科学基金;
关键词
Multi-mode resource-constrained project scheduling; time-of-use tariffs; multiple shifts; fast non-dominant genetic algorithm; energy-aware scheduling; NEIGHBORHOOD SEARCH; GENETIC ALGORITHM; LOCAL SEARCH; OPTIMIZATION; COST; POLICY; MODES;
D O I
10.1080/00207543.2024.2403774
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Considering the characteristics of time-of-use tariffs and multi-shifts in real-life project execution scenarios, we present a multi-mode resource-constrained project scheduling problem with multi-shift and time-of-use tariffs (MRCPSP-MS-TOU). The MRCPSP-MS-TOU is a bi-objective scheduling problem that aims to simultaneously minimise both project duration and energy costs. In this problem, renewable resources are the critical equipment that consumes the most energy and can work continuously for multiple shifts. Activities that require critical equipment with high energy consumption are given priority for shifts with lower electricity prices under time-of-use tariffs. We construct a mixed integer linear programming model for the MRCPSP-MS-TOU. For small-scale projects, the epsilon-constraint method is implemented to solve the MRCPSP-MS-TOU using the Gurobi optimiser. For large-scale projects, this paper develops meta-heuristic algorithms in the framework of the two non-dominated sorting genetic algorithm versions. The MRCPSP-MS-TOU enables manufacturers and the construction industry to schedule projects using time-of-use tariffs and multi-shifts in a more efficient manner since it can control the intensity of energy consumption, reduce project costs, make full use of energy-intensive equipment, and effectively reduce order delivery time.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [2] Multi-mode resource-constrained project scheduling problem with alternative project structures
    Tao, Sha
    Dong, Zhijie Sasha
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 333 - 347
  • [3] Modeling of the flexible resource-constrained multi-mode project scheduling problem
    School of Management, Wuhan University of Technology, Wuhan 430070, China
    不详
    [J]. Wuhan Ligong Daxue Xuebao, 2008, 11 (176-179+188):
  • [4] Multi-mode resource-constrained project scheduling problem with activities overlapping
    Chu Z.
    Xu Z.
    Yu J.
    [J]. Xu, Zhe (xuzhebuaa@163.com), 1600, CIMS (23): : 557 - 566
  • [5] Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with SMT
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. 2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 239 - 246
  • [6] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Alessandro Hill
    Eduardo Lalla-Ruiz
    Stefan Voß
    Marcos Goycoolea
    [J]. Journal of Scheduling, 2019, 22 : 173 - 182
  • [7] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Hill, Alessandro
    Lalla-Ruiz, Eduardo
    Voss, Stefan
    Goycoolea, Marcos
    [J]. JOURNAL OF SCHEDULING, 2019, 22 (02) : 173 - 182
  • [8] The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 119 (02) : 538 - 556
  • [9] Providing Lower Bounds for the Multi-Mode Resource-Constrained Project Scheduling Problem
    Stuerck, Christian
    Gerhards, Patrick
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 551 - 557
  • [10] Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    Alcaraz, J
    Maroto, C
    Ruiz, R
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) : 614 - 626