Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices

被引:0
|
作者
Peng, Wuliang [1 ]
Yu, Dongmin [1 ]
Xie, Fang [1 ]
机构
[1] Yantai Univ, Sch Econ & Management, Yantai 264005, Peoples R China
基金
中国国家自然科学基金;
关键词
Multi-mode resource-constrained project scheduling; time-of-use tariffs; multiple shifts; fast non-dominant genetic algorithm; energy-aware scheduling; NEIGHBORHOOD SEARCH; GENETIC ALGORITHM; LOCAL SEARCH; OPTIMIZATION; COST; POLICY; MODES;
D O I
10.1080/00207543.2024.2403774
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Considering the characteristics of time-of-use tariffs and multi-shifts in real-life project execution scenarios, we present a multi-mode resource-constrained project scheduling problem with multi-shift and time-of-use tariffs (MRCPSP-MS-TOU). The MRCPSP-MS-TOU is a bi-objective scheduling problem that aims to simultaneously minimise both project duration and energy costs. In this problem, renewable resources are the critical equipment that consumes the most energy and can work continuously for multiple shifts. Activities that require critical equipment with high energy consumption are given priority for shifts with lower electricity prices under time-of-use tariffs. We construct a mixed integer linear programming model for the MRCPSP-MS-TOU. For small-scale projects, the epsilon-constraint method is implemented to solve the MRCPSP-MS-TOU using the Gurobi optimiser. For large-scale projects, this paper develops meta-heuristic algorithms in the framework of the two non-dominated sorting genetic algorithm versions. The MRCPSP-MS-TOU enables manufacturers and the construction industry to schedule projects using time-of-use tariffs and multi-shifts in a more efficient manner since it can control the intensity of energy consumption, reduce project costs, make full use of energy-intensive equipment, and effectively reduce order delivery time.
引用
收藏
页数:24
相关论文
共 50 条
  • [31] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Sabzehparvar, Majid
    Seyed-Hosseini, S. Mohammad
    [J]. JOURNAL OF SUPERCOMPUTING, 2008, 44 (03): : 257 - 273
  • [32] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Majid Sabzehparvar
    S. Mohammad Seyed-Hosseini
    [J]. The Journal of Supercomputing, 2008, 44 : 257 - 273
  • [33] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    [J]. ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677
  • [34] A multi-mode resource-constrained scheduling problem in the context of port operations
    Lorenzoni, Luciano Lessa
    Ahonen, Hannu
    Gomes de Alvarenga, Arlindo
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 50 (1-2) : 55 - 65
  • [35] A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
    Bold, Matthew
    Goerigk, Marc
    [J]. OPERATIONS RESEARCH LETTERS, 2022, 50 (05) : 581 - 587
  • [36] A Modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem
    Vanucci, Sanderson C.
    Bicalho, Rafael
    Carrano, Eduardo G.
    Takahashi, Ricardo H. C.
    [J]. 2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
  • [37] Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu
    Raphael, Benny
    Ekambaram, Palaneeswaran
    Kuppuswamy, Ananthanarayanan
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) : 893 - 916
  • [38] An adaptive large neighbourhood search as a matheuristic for the multi-mode resource-constrained project scheduling problem
    Gerhards, Patrick
    Stuerck, Christian
    Fink, Andreas
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 774 - 791
  • [39] A Continuous-Time MILP Formulation for the Multi-Mode Resource-Constrained Project Scheduling Problem
    Gnagi, M.
    Rihm, T.
    Trautmann, N.
    [J]. 2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 452 - 456
  • [40] A Constraint Programming Formulation of the Multi-Mode Resource-Constrained Project Scheduling Problem for the Flexible Job Shop Scheduling Problem
    Yuraszeck, Francisco
    Montero, Elizabeth
    Canut-De-Bon, Dario
    Cuneo, Nicolas
    Rojel, Maximiliano
    [J]. IEEE ACCESS, 2023, 11 : 144928 - 144938