Optimizing time, cost and quality in multi-mode resource-constrained project scheduling

被引:23
|
作者
Kannimuthu, Marimuthu [1 ,2 ]
Raphael, Benny [1 ]
Palaneeswaran, Ekambaram [3 ]
Kuppuswamy, Ananthanarayanan [1 ]
机构
[1] Indian Inst Technol Madras, Dept Civil Engn, Chennai, Tamil Nadu, India
[2] Swinburne Univ Technol, Dept Civil & Construct Engn, Hawthorn, Vic, Australia
[3] Swinburne Univ Technol, Dept Civil & Construct Engn, Fac Sci Engn & Technol, Hawthorn, Vic, Australia
关键词
Multi-objective optimization; Global optimization; Construction quality assessment system (CONQUAS); Multi-criterion decision-making; Multi-mode resource-constrained project scheduling; Time-cost-quality; TRADE-OFF PROBLEMS; DIFFERENTIAL EVOLUTION; GENETIC ALGORITHMS; DECISION-MAKING; DISCRETE-TIME; CONSTRUCTION; OPTIMIZATION; MODEL; PRODUCTIVITY;
D O I
10.1108/BEPAM-04-2018-0075
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose - The purpose of this paper is to develop a framework to optimize time, cost and quality in a multi-mode resource-constrained project scheduling environment. Design/methodology/approach - A case study approach identified the activity execution modes in building construction projects in India to support multi-mode resource-constrained project scheduling. The data required to compute time, cost and quality of each activity are compiled from real construction projects. A binary integer-programming model has been developed to perform multi-objective optimization and identify Pareto optimal solutions. The RR-PARETO3 algorithm was used to identify the best compromise trade-off solutions. The effectiveness of the proposed framework is demonstrated through sample case study projects. Findings - Results show that good compromise solutions are obtained through multi-objective optimization of time, cost and quality. Research limitations/implications - Case study data sets were collected only from eight building construction projects in India. Practical implications - It is feasible to adopt multi-objective optimization in practical construction projects using time, cost and quality as the objectives; Pareto surfaces help to quantify relationships among time, cost and quality. It is shown that cost can be reduced by increasing the duration, and quality can be improved only by increasing the cost. Originality/value - The use of different activity execution modes compiled from multiple projects in optimization is illustrated, and good compromise solutions for the multi-mode resource-constrained project scheduling problems using multi-objective optimization are identified.
引用
收藏
页码:44 / 63
页数:20
相关论文
共 50 条
  • [1] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [2] Resource-constrained project scheduling: a heuristic for the multi-mode case
    Heilmann, R
    [J]. OR SPEKTRUM, 2001, 23 (03) : 335 - 357
  • [3] Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    Joanna Józefowska
    Marek Mika
    Rafał Różycki
    Grzegorz Waligóra
    Jan Węglarz
    [J]. Annals of Operations Research, 2001, 102 : 137 - 155
  • [4] Simulated annealing for multi-mode resource-constrained project scheduling
    Józefowska, J
    Mika, M
    Rózycki, R
    Waligóra, G
    Weglarz, J
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 137 - 155
  • [5] Modelling and Solving Multi-mode Resource-Constrained Project Scheduling
    Szeredi, Ria
    Schutt, Andreas
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 483 - 492
  • [6] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling
    Tchao, Celso
    Martins, Simone L.
    [J]. LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
  • [7] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [8] Multi-mode resource-constrained project scheduling problem with alternative project structures
    Tao, Sha
    Dong, Zhijie Sasha
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 333 - 347
  • [9] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    [J]. Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [10] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    [J]. IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999