共 50 条
- [1] Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling [J]. Annals of Operations Research, 2001, 102 : 137 - 155
- [3] Resource-constrained project scheduling: a heuristic for the multi-mode case [J]. OR SPEKTRUM, 2001, 23 (03): : 335 - 357
- [4] Modelling and Solving Multi-mode Resource-Constrained Project Scheduling [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 483 - 492
- [5] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling [J]. LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
- [10] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167