Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem

被引:11
|
作者
Elloumi, Sonda [1 ,2 ]
Loukil, Taicir [2 ]
Fortemps, Philippe [3 ]
机构
[1] Saudi Elect Univ, Dammam Branch, Dammam, Saudi Arabia
[2] Univ Sfax, Sfax, Tunisia
[3] Univ Mons, Engn Innovat Management Unit, Mons, Belgium
关键词
Project scheduling; Resource-constrained; Multiple modes; Disruption; Reactive heuristics;
D O I
10.1016/j.eswa.2020.114132
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper accounts for the mode change disruption in the Multi-mode Resource-Constrained Project Scheduling Problem (MRCPSP). In fact, during its execution, the project may face some unexpected events, which can lead to the schedule deterioration or even unfeasibility. A reactive mathematical modeling is proposed. Moreover, three heuristics with several variants are suggested to repair the initial disrupted schedule. These heuristics aim to perform a very quick response to provide the project manager with, hopefully, a feasible schedule. An extensive computational study is performed on PSPLIB benchmark instances with complementary generated data. Finally, the experimental results have shown that the three heuristics outperform Cplex in terms of the CPU running time. Moreover, Lexicographic Regret-Based Heuristic (LRBH) outranks the other heuristics in finding feasible solutions and in terms of the makespan deviation.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling
    Tchao, Celso
    Martins, Simone L.
    [J]. LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
  • [2] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [3] Multi-mode resource-constrained project scheduling problem with alternative project structures
    Tao, Sha
    Dong, Zhijie Sasha
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 333 - 347
  • [5] Modeling of the flexible resource-constrained multi-mode project scheduling problem
    School of Management, Wuhan University of Technology, Wuhan 430070, China
    不详
    [J]. Wuhan Ligong Daxue Xuebao, 2008, 11 (176-179+188):
  • [6] Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with SMT
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. 2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 239 - 246
  • [7] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Alessandro Hill
    Eduardo Lalla-Ruiz
    Stefan Voß
    Marcos Goycoolea
    [J]. Journal of Scheduling, 2019, 22 : 173 - 182
  • [8] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Hill, Alessandro
    Lalla-Ruiz, Eduardo
    Voss, Stefan
    Goycoolea, Marcos
    [J]. JOURNAL OF SCHEDULING, 2019, 22 (02) : 173 - 182
  • [9] The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 119 (02) : 538 - 556
  • [10] Providing Lower Bounds for the Multi-Mode Resource-Constrained Project Scheduling Problem
    Stuerck, Christian
    Gerhards, Patrick
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 551 - 557