Work package-based information modeling for resource-constrained scheduling of construction projects

被引:45
|
作者
Wang, Heng-Wei [1 ,2 ]
Lin, Jia-Rui [1 ,2 ]
Zhang, Jian-Ping [1 ,2 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Tsinghua Univ Glodon Joint Res Ctr Bldg Informat, Beijing 100084, Peoples R China
基金
北京市自然科学基金; 国家重点研发计划;
关键词
Information modeling; Data integration; Resource-constrained scheduling; Work package; Constraint programming; Optimization; DIFFERENTIAL EVOLUTION; SERIAL METHOD; BIM; OPTIMIZATION; VISUALIZATION; INTEGRATION; SIMULATION; MANAGEMENT; FRAMEWORK;
D O I
10.1016/j.autcon.2019.102958
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As an essential problem in construction management, the resource-constrained project scheduling problem (RCPSP) has been studied for decades; however, an integrated information model that fully supports the RCPSP solving process is still lacking. Though building information modeling (BIM) was proposed to meet the data requirements in the building life cycle, some scheduling and resource information are not considered in information transfers between the information model and the RCPSP mathematical model. This paper presents an integrated approach that enables fluent data flow from the information model to the RCPSP model for construction scheduling. Within this approach, a work package-based information model is proposed to capture all the required data of the RCPSP. Then, a semiautomatic method that integrates multisource data is introduced to form the proposed information model, and an adaptive data transmission method is used to support a designed multimode resource-constrained project scheduling problem (MRCPSP) model. The models and approaches are validated using the data of an actual project, demonstrating the feasibility and efficiency. This study contributes a novel integrated approach to formalizing a construction information model using a semiautomatic data integration approach, covering the information requirement and enables fluent data flow in the RCPSP solving process. Meanwhile, the work package-based information model is a successful attempt to introduce previously-gained knowledge into automatic schedule generation processes. Future work, such as extending the information model, creating new methods for RCPSP model generation, and data analytics, can bring new opportunities to apply more complex and intelligent methods in project scheduling and construction management.
引用
收藏
页数:20
相关论文
共 50 条
  • [41] Performance of Resource-Constrained Scheduling Heuristics
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (04)
  • [42] Disorder considerations in resource-constrained scheduling
    Christodoulou, Symeon E.
    Ellinas, Georgios N.
    Aslani, Pooyan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (03) : 229 - 240
  • [43] A GRASP for a resource-constrained scheduling problem
    Sirdey R.
    Carlier J.
    Nace D.
    International Journal of Innovative Computing and Applications, 2010, 2 (03) : 143 - 149
  • [44] Tabu search for resource-constrained scheduling
    Verhoeven, MGA
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 106 (2-3) : 266 - 276
  • [45] Review of Resource-Constrained Scheduling Algorithms
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (11)
  • [46] SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING
    JEFFCOAT, DE
    BULFIN, RL
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) : 43 - 51
  • [47] Tabu search for resource-constrained scheduling
    Eindhoven Univ of Technology, Eindhoven, Netherlands
    Eur J Oper Res, 2-3 (266-276):
  • [48] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [49] Robust resource allocation decisions in resource-constrained projects
    Deblaere, Filip
    Demeulemeester, Erik
    Herroelen, Willy
    Van de Vonder, Stijn
    DECISION SCIENCES, 2007, 38 (01) : 5 - 37
  • [50] Resource-constrained workflow modeling
    Wang, Jiacun
    Tepfenhart, William
    Rosca, Daniela
    Tsai, Anni
    TASE 2007: FIRST JOINT IEEE/IFIP SYMPOSIUM ON THEORETICAL ASPECTS OF SOFTWARE ENGINEERING, PROCEEDINGS, 2007, : 171 - +