SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING

被引:29
|
作者
JEFFCOAT, DE [1 ]
BULFIN, RL [1 ]
机构
[1] AUBURN UNIV,COLL ENGN,DEPT IND ENGN,207 DUNSTAN HALL,AUBURN,AL 36849
关键词
RESOURCE-CONSTRAINED SCHEDULING; SIMULATED ANNEALING; HEURISTICS;
D O I
10.1016/0377-2217(93)90231-B
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We describe an application of several procedures to a resource-constrained scheduling problem. Basic and augmented neighborhood search procedures are first developed, using a unique way to generate neighborhoods. We then present a simulated annealing procedure which can be viewed as an evolution of the neighborhood search procedures. Computational results indicate that the procedures grow in power as they evolve, with the simulated annealing procedure providing the best results, and further, that it is a viable approach for a very difficult scheduling problem.
引用
收藏
页码:43 / 51
页数:9
相关论文
共 50 条
  • [1] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [2] Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    Joanna Józefowska
    Marek Mika
    Rafał Różycki
    Grzegorz Waligóra
    Jan Węglarz
    [J]. Annals of Operations Research, 2001, 102 : 137 - 155
  • [3] Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling
    Bettemir, Onder Halis
    Sonmez, Rifat
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
  • [4] Simulated annealing for multi-mode resource-constrained project scheduling
    Józefowska, J
    Mika, M
    Rózycki, R
    Waligóra, G
    Weglarz, J
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 137 - 155
  • [5] Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem
    Bouffard, Veronique
    Ferland, Jacques A.
    [J]. JOURNAL OF SCHEDULING, 2007, 10 (06) : 375 - 386
  • [6] Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem
    Véronique Bouffard
    Jacques A. Ferland
    [J]. Journal of Scheduling, 2007, 10 : 375 - 386
  • [7] Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling
    Shukla, Sanjay Kumar
    Son, Young Jun
    Tiwari, M. K.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (9-10): : 982 - 995
  • [8] Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling
    Sanjay Kumar Shukla
    Young Jun Son
    M. K. Tiwari
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 36 : 982 - 995
  • [9] Scheduling of resource-constrained projects
    Zilinskas, A
    [J]. INTERFACES, 2001, 31 (04) : 133 - 135
  • [10] RESOURCE-CONSTRAINED ASSIGNMENT SCHEDULING
    MAZZOLA, JB
    NEEBE, AW
    [J]. OPERATIONS RESEARCH, 1986, 34 (04) : 560 - 572