Work package-based information modeling for resource-constrained scheduling of construction projects

被引:45
|
作者
Wang, Heng-Wei [1 ,2 ]
Lin, Jia-Rui [1 ,2 ]
Zhang, Jian-Ping [1 ,2 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Tsinghua Univ Glodon Joint Res Ctr Bldg Informat, Beijing 100084, Peoples R China
基金
北京市自然科学基金; 国家重点研发计划;
关键词
Information modeling; Data integration; Resource-constrained scheduling; Work package; Constraint programming; Optimization; DIFFERENTIAL EVOLUTION; SERIAL METHOD; BIM; OPTIMIZATION; VISUALIZATION; INTEGRATION; SIMULATION; MANAGEMENT; FRAMEWORK;
D O I
10.1016/j.autcon.2019.102958
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As an essential problem in construction management, the resource-constrained project scheduling problem (RCPSP) has been studied for decades; however, an integrated information model that fully supports the RCPSP solving process is still lacking. Though building information modeling (BIM) was proposed to meet the data requirements in the building life cycle, some scheduling and resource information are not considered in information transfers between the information model and the RCPSP mathematical model. This paper presents an integrated approach that enables fluent data flow from the information model to the RCPSP model for construction scheduling. Within this approach, a work package-based information model is proposed to capture all the required data of the RCPSP. Then, a semiautomatic method that integrates multisource data is introduced to form the proposed information model, and an adaptive data transmission method is used to support a designed multimode resource-constrained project scheduling problem (MRCPSP) model. The models and approaches are validated using the data of an actual project, demonstrating the feasibility and efficiency. This study contributes a novel integrated approach to formalizing a construction information model using a semiautomatic data integration approach, covering the information requirement and enables fluent data flow in the RCPSP solving process. Meanwhile, the work package-based information model is a successful attempt to introduce previously-gained knowledge into automatic schedule generation processes. Future work, such as extending the information model, creating new methods for RCPSP model generation, and data analytics, can bring new opportunities to apply more complex and intelligent methods in project scheduling and construction management.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] A PETRI-NET BASED APPROACH FOR SCHEDULING AND RESCHEDULING RESOURCE-CONSTRAINED MULTIPLE PROJECTS
    Kao, Hsing-Pei
    Hsieh, Ben
    Yeh, Yingchieh
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 468 - 477
  • [22] Resource-constrained scheduling for continuous repetitive projects with time-based production units
    Hsie, Machine
    Chang, Ching-Jung
    Yang, I-Tung
    Huang, Chun-Yen
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 942 - 949
  • [23] Scheduling of construction projects under resource-constrained conditions with a specifically developed software using genetic algorithms
    Erdal, Mursel
    Kanit, Recep
    Tehnicki Vjesnik, 2021, 28 (04): : 1362 - 1370
  • [24] Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (05) : 649 - 659
  • [25] Scheduling of Construction Projects under Resource-Constrained Conditions with a Specifically Developed Software using Genetic Algorithms
    Erdal, Mursel
    Kanit, Recep
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2021, 28 (04): : 1362 - 1370
  • [26] Resource-Constrained Multiple Projects Scheduling with the Objective of Minimizing Activities Cost
    Liu, Zhenyuan
    Zheng, Yanqi
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1027 - 1032
  • [27] Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents
    Christodoulou, Symeon M.
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2010, 24 (01) : 45 - 55
  • [28] RESOURCE-CONSTRAINED ASSIGNMENT SCHEDULING
    MAZZOLA, JB
    NEEBE, AW
    OPERATIONS RESEARCH, 1986, 34 (04) : 560 - 572
  • [29] HEURISTICS FOR RESOURCE-CONSTRAINED SCHEDULING
    ELSAYED, EA
    NASR, NZ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (02) : 299 - 310
  • [30] Constructive heuristics for selecting and scheduling alternative subgraphs in resource-constrained projects
    Nekoueian, Rojin
    Servranckx, Tom
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 182