Robust resource allocation decisions in resource-constrained projects

被引:36
|
作者
Deblaere, Filip [1 ]
Demeulemeester, Erik [1 ]
Herroelen, Willy [1 ]
Van de Vonder, Stijn [1 ]
机构
[1] Katholieke Univ Leuven, Res Ctr Operat Management, B-3000 Louvain, Belgium
关键词
D O I
10.1111/j.1540-5915.2007.00147.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The well-known deterministic resource-constrained project scheduling problem involves the determination of a predictive schedule (baseline schedule or pre-schedule) of the project activities that satisfies the finish-start precedence relations and the renewable resource constraints under the objective of minimizing the project duration. This baseline schedule serves as a baseline for the execution of the project. During execution, however, the project can be subject to several types of disruptions that may disturb the baseline schedule. Management must then rely on a reactive scheduling procedure for revising or reoptimizing the baseline schedule. The objective of our research is to develop procedures for allocating resources to the activities of a given baseline schedule in order to maximize its stability in the presence of activity duration variability. We propose three integer programming-based heuristics and one constructive procedure for resource allocation. We derive lower bounds for schedule stability and report on computational results obtained on a set of benchmark problems.
引用
收藏
页码:5 / 37
页数:33
相关论文
共 50 条
  • [1] Scheduling of resource-constrained projects
    Zilinskas, A
    [J]. INTERFACES, 2001, 31 (04) : 133 - 135
  • [2] Scheduling of resource-constrained projects
    Wilson, J
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [3] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    [J]. Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [4] A System for Generation and Visualization of Resource-Constrained Projects
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. ARTIFICIAL INTELLIGENCE RESEARCH AND DEVELOPMENT: RECENT ADVANCES AND APPLICATIONS, 2014, 269 : 237 - 246
  • [5] Equitable allocation of antiretrovirals in resource-constrained countries
    不详
    [J]. PLOS MEDICINE, 2005, 2 (02): : 85 - 85
  • [6] Joint Radio Resource Allocation and Control for Resource-Constrained Vehicle Platooning
    Zhang, Dayue
    Cheng, Nan
    Sun, Ruijin
    Lyu, Feng
    Hui, Yilong
    Li, Changle
    [J]. 2022 IEEE GLOBAL COMMUNICATIONS CONFERENCE (GLOBECOM 2022), 2022, : 3278 - 3283
  • [7] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [8] HEURISTICS FOR SCHEDULING RESOURCE-CONSTRAINED PROJECTS IN MPM NETWORKS
    ZHAN, J
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) : 192 - 205
  • [9] Evaluation of criticality analysis measurements in resource-constrained projects
    Cui, Wanan
    Song, Bin
    Yue, Chaoyuan
    Qin, Jiajun
    [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 4709 - +
  • [10] A scheduling procedure for a general class of resource-constrained projects
    Sung, CS
    Lim, SK
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (01) : 9 - 17