The relationship between the last planner® system and collaborative planning practice in UK construction

被引:39
|
作者
Daniel, Emmanuel Itodo [1 ]
Pasquire, Christine [1 ,2 ]
Dickens, Graham
Ballard, Herman Glenn [3 ]
机构
[1] Nottingham Trent Univ, Sch Architecture Design & Built Environm, Ctr Lean Projects, Nottingham, England
[2] Nottingham Trent Univ, Sch Architecture Design & Built Environm, Nottingham, England
[3] Univ Calif Berkeley, Project Prod Syst Lab Berkeley, Berkeley, CA 94720 USA
关键词
UK; Construction planning; Collaborative planning; Construction sector; Last planner system; Production planning and management;
D O I
10.1108/ECAM-07-2015-0109
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this paper is to identify how the newly emerging UK practice of "collaborative planning" (CP) for construction project delivery aligns with the advocated principles of the global last planner system (LPS) of production planning and control. Design/methodology/approach - A mixed, qualitative, exploratory approach was adopted for the study. This entailed qualitative data through three techniques, namely: semi-structured interviews, documents analysis, and structured observation. In total, 30 in-depth interviews were conducted over a 12 month period with lean construction consultants, clients, main contractors, and subcontractors drawn from the building, highways and infrastructure and rail sector. In all, 15 projects were visited where practices were observed. Findings - The study reveals that the current practice of CP in the UK partially aligns with the LPS principles. Where practitioners have heard of the LPS they believe it to be the same practice as CP. Research limitations/implications - This study is limited to 30 interviews, observation of 15 projects and document analysis. The aim of the study is not to generalise the findings, however, since the study examined top construction companies and practitioners in the UK and the findings were consistent across the sample, some conclusions could be made. The study is also limited to examining the construction phase only, future studies should incorporate the design phase. Practical implications - A clear identification of the elements of current practice compared to the components of the LPS provides a contribution to the future practice of project production planning and management in the construction industry. Social implications - The study highlights a continuing resistance to collaboration within the industry. This resistance is subtly embedded within implemented practices even though they are based on collaborative working for their success. Originality/value - This is among the first studies in the UK that comprehensively examines and reports the application of LPS/CP practice in construction across the major construction sectors. Future studies could build on the findings from this work to develop an approach/methodology to improve the current practice.
引用
收藏
页码:407 / 425
页数:19
相关论文
共 50 条
  • [31] Integration of BREEAM-NOR in construction projects: Utilizing the Last Planner System
    Nesteby, Ase I.
    Aarrestad, Marie E.
    Lohne, Jardar
    Bohne, Rolf A.
    SUSTAINABLE BUILT ENVIRONMENT TALLINN AND HELSINKI CONFERENCE SBE16 BUILD GREEN AND RENOVATE DEEP, 2016, 96 : 100 - 111
  • [32] Production planning, monitoring and review: comparison between the practices in an urban rail transit megaproject with the Last Planner System
    Belayutham, Sheila
    Jaafar, Rabiatul Nurul Akmar Mohamad
    Ismail, Herda Balqis
    Ibrahim, Che Khairil Izam Che
    TQM JOURNAL, 2022, 34 (03): : 515 - 533
  • [33] Evaluating the Efficacy of a Dedicated Last Planner® System Facilitator to Enhance Construction Productivity
    Power, William
    Sinnott, Derek
    Lynch, Patrick
    CONSTRUCTION ECONOMICS AND BUILDING, 2021, 21 (03): : 142 - 158
  • [34] Investigating the challenges related to combining BIM and Last Planner System on construction sites
    Conrad Boton
    Yaya Pitti
    Daniel Forgues
    Ivanka Iordanova
    Frontiers of Engineering Management, 2021, 8 : 172 - 182
  • [35] Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects
    Castillo, Tito
    Alarcon, Luis F.
    Salvatierra, Jose Luis
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (03)
  • [36] Investigating the challenges related to combining BIM and Last Planner System on construction sites
    Boton, Conrad
    Pitti, Yaya
    Forgues, Daniel
    Iordanova, Ivanka
    FRONTIERS OF ENGINEERING MANAGEMENT, 2021, 8 (02) : 172 - 182
  • [37] Challenges of Performance Measurement in Lean Construction and the Last Planner System®: A Norwegian Case
    Bygballe, Lena E.
    Sand-Holm, Sanne K.
    Pakoglu, Ceyda
    Svalestuen, Fredrik
    Lean Construction Journal, 2022, 2022 : 24 - 40
  • [38] The Last Planner System in China's construction industry - A SWOT analysis on implementation
    Shang, Gao
    Pheng, Low Sui
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (07) : 1260 - 1272
  • [39] Effects of the Last Planner System on Social Networks among Construction Trade Crews
    Priven, Vitaliy
    Sacks, Rafael
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (06)
  • [40] The Last Planner System as an Emergent Production Planning and Control Method: The Role of Multiple Representations
    Hamerski, Douglas Comassetto
    Saurin, Tarcisio Abreu
    Formoso, Carlos T.
    Isatto, Eduardo Luis
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (11)