Investigating the challenges related to combining BIM and Last Planner System on construction sites

被引:0
|
作者
Conrad Boton
Yaya Pitti
Daniel Forgues
Ivanka Iordanova
机构
[1] École de Technologie Supérieure,Department of Construction Engineering
来源
关键词
Building Information Modeling; Last Planner System; construction site; lean construction;
D O I
暂无
中图分类号
学科分类号
摘要
The construction industry is facing a gradual but important transformation toward more productivity and collaboration. In this framework, two major approaches are often cited in the literature as having the potential to improve the practices in the industry: Building Information Modeling (BIM) and Lean Construction. Several scientific studies have demonstrated the synergy of these two approaches and very recent research has reported positive results from the use of software applications as support for their implementation on construction sites. However, the stakes of such integration have been very little studied. This article presents the results of a research project conducted within a general contractor firm that decided to implement BIM and Last Planner System (LPS) on its construction sites. The research uses a four-stage action research approach, including the characterization of the research issue, the establishment of an action plan, its implementation and its evaluation. Compared to recent related studies, the research is less enthusiastic. While it highlights the need for new tools to improve production planning and control, it also points to a strong resistance to change by practitioners at the site. They emphasize the necessity for adequate pre-service training and the need for new resources that can work full-time on the ongoing training of site teams. In addition, some limitations of the tool lead workers to believe that it can quickly become a factor that slows down their daily work rather than improving it. Based on the advice of professionals, the paper formulates some recommendations to the industry, the researchers and the software developers.
引用
收藏
页码:172 / 182
页数:10
相关论文
共 50 条
  • [1] Investigating the challenges related to combining BIM and Last Planner System on construction sites
    Conrad BOTON
    Yaya PITTI
    Daniel FORGUES
    IvankaIORDANOVA
    Frontiers of Engineering Management, 2021, (02) : 172 - 182
  • [2] Investigating the challenges related to combining BIM and Last Planner System on construction sites
    Boton, Conrad
    Pitti, Yaya
    Forgues, Daniel
    Iordanova, Ivanka
    FRONTIERS OF ENGINEERING MANAGEMENT, 2021, 8 (02) : 172 - 182
  • [3] Last planner system in construction
    Cwik, Katarzyna
    Roslon, Jerzy
    RSP 2017 - XXVI R-S-P SEMINAR 2017 THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2017, 117
  • [4] BIM-based Last Planner System tool for improving construction project management
    Heigermoser, Daniel
    de Soto, Borja Garcia
    Abbott, Ernest Leslie Sidney
    Chua, David Kim Huat
    AUTOMATION IN CONSTRUCTION, 2019, 104 : 246 - 254
  • [5] Challenges of Performance Measurement in Lean Construction and the Last Planner System®: A Norwegian Case
    Bygballe, Lena E.
    Sand-Holm, Sanne K.
    Pakoglu, Ceyda
    Svalestuen, Fredrik
    Lean Construction Journal, 2022, 2022 : 24 - 40
  • [6] Lean Construction in the UAE: Implementation of Last Planner System®
    Warid, Osama
    Hamani, Karima
    Lean Construction Journal, 2023, 2023 : 01 - 20
  • [7] Last planner system results in subcontract construction company
    Andrade, M.
    Arrieta, B.
    REVISTA DE LA CONSTRUCCION, 2011, 10 (01): : 36 - 52
  • [8] Takt Complementing Last Planner® System on Residential Construction Projects
    Power, William
    Sinnott, Derek
    Lynch, Patrick
    CONSTRUCTION ECONOMICS AND BUILDING, 2024, 24 (4-5): : 58 - 80
  • [9] Experiences from the implementation of last planner system® in construction project
    Venkatesh, Prasad Kudrekodlu
    Venkatesan, Vasugi
    INDIAN JOURNAL OF ENGINEERING AND MATERIALS SCIENCES, 2021, 28 (02) : 125 - 141
  • [10] Framework for Managing Integration Challenges of Last Planner System in IMPs
    El-Sabek, Luai M.
    McCabe, Brenda Y.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (05)