Investigating the challenges related to combining BIM and Last Planner System on construction sites

被引:0
|
作者
Conrad Boton
Yaya Pitti
Daniel Forgues
Ivanka Iordanova
机构
[1] École de Technologie Supérieure,Department of Construction Engineering
来源
关键词
Building Information Modeling; Last Planner System; construction site; lean construction;
D O I
暂无
中图分类号
学科分类号
摘要
The construction industry is facing a gradual but important transformation toward more productivity and collaboration. In this framework, two major approaches are often cited in the literature as having the potential to improve the practices in the industry: Building Information Modeling (BIM) and Lean Construction. Several scientific studies have demonstrated the synergy of these two approaches and very recent research has reported positive results from the use of software applications as support for their implementation on construction sites. However, the stakes of such integration have been very little studied. This article presents the results of a research project conducted within a general contractor firm that decided to implement BIM and Last Planner System (LPS) on its construction sites. The research uses a four-stage action research approach, including the characterization of the research issue, the establishment of an action plan, its implementation and its evaluation. Compared to recent related studies, the research is less enthusiastic. While it highlights the need for new tools to improve production planning and control, it also points to a strong resistance to change by practitioners at the site. They emphasize the necessity for adequate pre-service training and the need for new resources that can work full-time on the ongoing training of site teams. In addition, some limitations of the tool lead workers to believe that it can quickly become a factor that slows down their daily work rather than improving it. Based on the advice of professionals, the paper formulates some recommendations to the industry, the researchers and the software developers.
引用
收藏
页码:172 / 182
页数:10
相关论文
共 50 条
  • [31] The relationship between the last planner® system and collaborative planning practice in UK construction
    Daniel, Emmanuel Itodo
    Pasquire, Christine
    Dickens, Graham
    Ballard, Herman Glenn
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) : 407 - 425
  • [32] Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects
    Castillo, Tito
    Alarcon, Luis F.
    Salvatierra, Jose Luis
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (03)
  • [33] The Last Planner System in China's construction industry - A SWOT analysis on implementation
    Shang, Gao
    Pheng, Low Sui
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (07) : 1260 - 1272
  • [34] Effects of the Last Planner System on Social Networks among Construction Trade Crews
    Priven, Vitaliy
    Sacks, Rafael
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (06)
  • [35] Using the Last Planner System to tackle the social aspects of BIM-enabled MEP coordination
    Tillmann, Patricia Andre
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (02) : 140 - 152
  • [36] Integration between the last planner system and the quality management system applied in the civil construction sector
    Diaz, L.
    de Oliveira, M.
    Pucharelli, P.
    Pinzon, J.
    REVISTA INGENIERIA DE CONSTRUCCION, 2019, 34 (02): : 146 - 158
  • [37] The Usefulness of Adopting the Last Planner System in the Construction Process of Addis Ababa Road Projects
    Limenih, Zenawi Mehari
    Demisse, Belachew Asteray
    Haile, Abenezer Tariku
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [38] Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks
    Wambeke, Brad W.
    Liu, Min
    Hsiang, Simon M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (04) : 491 - 498
  • [39] Investigating conflicts of expert contractors using the last planner system in building information modeling process
    Amany, Adib
    Taghizade, Katayoon
    Noorzai, Esmatullah
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (06) : 1381 - 1402
  • [40] Integrating critical chain project management with last planner system for linear scheduling of modular construction
    Salama, Tarek
    Salah, Ahmad
    Moselhi, Osama
    CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (04): : 525 - 554