Investigating the challenges related to combining BIM and Last Planner System on construction sites

被引:0
|
作者
Conrad Boton
Yaya Pitti
Daniel Forgues
Ivanka Iordanova
机构
[1] École de Technologie Supérieure,Department of Construction Engineering
来源
关键词
Building Information Modeling; Last Planner System; construction site; lean construction;
D O I
暂无
中图分类号
学科分类号
摘要
The construction industry is facing a gradual but important transformation toward more productivity and collaboration. In this framework, two major approaches are often cited in the literature as having the potential to improve the practices in the industry: Building Information Modeling (BIM) and Lean Construction. Several scientific studies have demonstrated the synergy of these two approaches and very recent research has reported positive results from the use of software applications as support for their implementation on construction sites. However, the stakes of such integration have been very little studied. This article presents the results of a research project conducted within a general contractor firm that decided to implement BIM and Last Planner System (LPS) on its construction sites. The research uses a four-stage action research approach, including the characterization of the research issue, the establishment of an action plan, its implementation and its evaluation. Compared to recent related studies, the research is less enthusiastic. While it highlights the need for new tools to improve production planning and control, it also points to a strong resistance to change by practitioners at the site. They emphasize the necessity for adequate pre-service training and the need for new resources that can work full-time on the ongoing training of site teams. In addition, some limitations of the tool lead workers to believe that it can quickly become a factor that slows down their daily work rather than improving it. Based on the advice of professionals, the paper formulates some recommendations to the industry, the researchers and the software developers.
引用
收藏
页码:172 / 182
页数:10
相关论文
共 50 条
  • [41] Synthesizing Last Planner® System, Takt, and Scrum Theory and Practice to Enhance Construction Project Delivery
    Power, William
    Sinnott, Derek
    Lynch, Patrick
    Lean Construction Journal, 2024, 2024 : 16 - 28
  • [42] Integrating critical chain project management with last planner system for linear scheduling of modular construction
    Salama, Tarek
    Salah, Ahmad
    Moselhi, Osama
    Construction Innovation, 2021, 21 (04): : 525 - 554
  • [43] Exploring the links between simulation modelling and construction production planning and control: a case study on the last planner system
    Abdelmegid, Mohammed Adel
    Gonzalez, Vicente A.
    O'Sullivan, Michael
    Walker, Cameron G.
    Poshdar, Mani
    Alarcon, Luis Fernando
    PRODUCTION PLANNING & CONTROL, 2023, 34 (05) : 459 - 476
  • [44] Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review
    Agrawal, Ajay Kumar
    Zou, Yang
    Chen, Long
    Abdelmegid, Mohammed Adel
    González, Vicente A.
    Developments in the Built Environment, 2024, 18
  • [45] The Last Planner® System and Building Information Modeling in Construction Execution: From an Integrative Review to a Conceptual Model for Integration
    Schimanski, Christoph Paul
    Marcher, Carmen
    Monizza, Gabriele Pasetti
    Matt, Dominik T.
    APPLIED SCIENCES-BASEL, 2020, 10 (03):
  • [46] Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review
    Agrawal, Ajay Kumar
    Zou, Yang
    Chen, Long
    Abdelmegid, Mohammed Adel
    Gonzalez, Vicente A.
    DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2024, 18
  • [47] Investigating on Combining System Dynamics and Machine Learning for Predicting Safety Performance in Construction Projects
    Nishat, Mirza Muntasir
    Borkenhagen, Ingrid Renolen
    Olsen, Jenni Sveen
    Rauzy, Antoine
    12TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANISATION, 2024, 2024, 1389
  • [48] Collaborative work tools in Spanish construction sector. Best practice proposal to implement Last Planner System (LPS)
    del Solar, Patricia
    del Rio, Mercedes
    Fuente, Raul
    Esteban, Celia
    INFORMES DE LA CONSTRUCCION, 2021, 73 (561)
  • [49] Key Last Planner System Metrics to Assess Project Performance in High-Rise Building and Industrial Construction Projects
    Perez, Daniel
    Lagos, Camilo
    Alarcon, Luis Fernando
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (01)
  • [50] Impacts of the Social Subcontract and Last Planner System Interventions on the Trade-Crew Workflows of Multistory Residential Construction Projects
    Priven, Vitaliy
    Sacks, Rafael
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (07)