Challenges of Performance Measurement in Lean Construction and the Last Planner System®: A Norwegian Case

被引:0
|
作者
Bygballe, Lena E. [1 ]
Sand-Holm, Sanne K. [2 ]
Pakoglu, Ceyda [3 ]
Svalestuen, Fredrik [4 ]
机构
[1] Centre for the Construction Industry, BI Norwegian Business School, Norway
[2] Business consultant, Columbus Norge AS, Norway
[3] Business consultant, Sopra Steria Group SA, France
[4] Production-and process manager at Veidekke AS, Norway
来源
Lean Construction Journal | 2022年 / 2022卷
关键词
Lean production;
D O I
暂无
中图分类号
学科分类号
摘要
Question: How and why is performance measured in relation to Lean Construction (LC) and the Last Planner System® (LPS®)? What are key challenges thereof, and how might these be overcome? Purpose: The purpose of this research is to add better understanding of performance measurement in relation to LC and the LPS by addressing key challenges and provide suggestions of how to overcome these. Research Method: The paper draws upon a qualitative case study of a construction company in Norway and its use of performance measurement in relation to the LPS. Findings: The findings demonstrate that performance is measured in various ways and to various extents in the case company. They also demonstrate that a more strategic and systematic approach to performance measurement is needed to cope with the challenges of measuring performance and to reap the benefits of LC and the LPS. This includes sensitivity to social conditions related to performance measurement. Limitations: The paper is based on a single case study in the Norwegian setting, and future studies should seek to build on and refine the findings presented here. Implications: If performance measurement, both in relation to the LPS and more generally to LC is not sensitive to social issues, it might lead to avoidance and neglect at best, and opportunism and abuse at worst. Value for practitioners: The paper addresses key issues and challenges involved in performance measurement in relation to LC and the LPS, and how practitioners might reap the benefits and avoid pitfalls associated with performance measurement. © 2022, Lean Construction Institute. All rights reserved.
引用
收藏
页码:24 / 40
相关论文
共 50 条
  • [1] Lean Construction in the UAE: Implementation of Last Planner System®
    Warid, Osama
    Hamani, Karima
    [J]. Lean Construction Journal, 2023, 2023 : 01 - 20
  • [2] Lean construction: Implementing the Last Planner System on mining projects
    Govindasamy, T.
    Bekker, M. C.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2024, 124 (01) : 15 - 24
  • [3] Research on the Emergence Mechanism of Last Planner System of Lean Construction
    Zhu Kongguo
    [J]. 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 3643 - 3646
  • [4] Last planner system oriented to lean construction: A literature review
    Han, Mei-Gui
    Wang, Zhuo-Fu
    Jin, De-Zhi
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2012, 32 (04): : 721 - 730
  • [5] Last planner system in construction
    Cwik, Katarzyna
    Roslon, Jerzy
    [J]. RSP 2017 - XXVI R-S-P SEMINAR 2017 THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2017, 117
  • [6] The contributions of the Last Planner System to resilient performance in construction projects
    Hamerski, Douglas Comassetto
    Saurin, Tarcisio Abreu
    Formoso, Carlos Torres
    Isatto, Eduardo Luis
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2024, 42 (04) : 328 - 345
  • [7] Investigating the challenges related to combining BIM and Last Planner System on construction sites
    Conrad BOTON
    Yaya PITTI
    Daniel FORGUES
    IvankaIORDANOVA
    [J]. Frontiers of Engineering Management, 2021, (02) : 172 - 182
  • [8] Investigating the challenges related to combining BIM and Last Planner System on construction sites
    Conrad Boton
    Yaya Pitti
    Daniel Forgues
    Ivanka Iordanova
    [J]. Frontiers of Engineering Management, 2021, 8 : 172 - 182
  • [9] Investigating the challenges related to combining BIM and Last Planner System on construction sites
    Boton, Conrad
    Pitti, Yaya
    Forgues, Daniel
    Iordanova, Ivanka
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2021, 8 (02) : 172 - 182
  • [10] Predicting construction schedule performance with last planner system and machine learning
    Lagos, Camilo I.
    Herrera, Rodrigo F.
    Cawley, Alejandro F. Mac
    Alarcon, Luis F.
    [J]. AUTOMATION IN CONSTRUCTION, 2024, 167