The relationship between the last planner® system and collaborative planning practice in UK construction

被引:39
|
作者
Daniel, Emmanuel Itodo [1 ]
Pasquire, Christine [1 ,2 ]
Dickens, Graham
Ballard, Herman Glenn [3 ]
机构
[1] Nottingham Trent Univ, Sch Architecture Design & Built Environm, Ctr Lean Projects, Nottingham, England
[2] Nottingham Trent Univ, Sch Architecture Design & Built Environm, Nottingham, England
[3] Univ Calif Berkeley, Project Prod Syst Lab Berkeley, Berkeley, CA 94720 USA
关键词
UK; Construction planning; Collaborative planning; Construction sector; Last planner system; Production planning and management;
D O I
10.1108/ECAM-07-2015-0109
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this paper is to identify how the newly emerging UK practice of "collaborative planning" (CP) for construction project delivery aligns with the advocated principles of the global last planner system (LPS) of production planning and control. Design/methodology/approach - A mixed, qualitative, exploratory approach was adopted for the study. This entailed qualitative data through three techniques, namely: semi-structured interviews, documents analysis, and structured observation. In total, 30 in-depth interviews were conducted over a 12 month period with lean construction consultants, clients, main contractors, and subcontractors drawn from the building, highways and infrastructure and rail sector. In all, 15 projects were visited where practices were observed. Findings - The study reveals that the current practice of CP in the UK partially aligns with the LPS principles. Where practitioners have heard of the LPS they believe it to be the same practice as CP. Research limitations/implications - This study is limited to 30 interviews, observation of 15 projects and document analysis. The aim of the study is not to generalise the findings, however, since the study examined top construction companies and practitioners in the UK and the findings were consistent across the sample, some conclusions could be made. The study is also limited to examining the construction phase only, future studies should incorporate the design phase. Practical implications - A clear identification of the elements of current practice compared to the components of the LPS provides a contribution to the future practice of project production planning and management in the construction industry. Social implications - The study highlights a continuing resistance to collaboration within the industry. This resistance is subtly embedded within implemented practices even though they are based on collaborative working for their success. Originality/value - This is among the first studies in the UK that comprehensively examines and reports the application of LPS/CP practice in construction across the major construction sectors. Future studies could build on the findings from this work to develop an approach/methodology to improve the current practice.
引用
收藏
页码:407 / 425
页数:19
相关论文
共 50 条
  • [41] BIM-based Last Planner System tool for improving construction project management
    Heigermoser, Daniel
    de Soto, Borja Garcia
    Abbott, Ernest Leslie Sidney
    Chua, David Kim Huat
    AUTOMATION IN CONSTRUCTION, 2019, 104 : 246 - 254
  • [42] The Usefulness of Adopting the Last Planner System in the Construction Process of Addis Ababa Road Projects
    Limenih, Zenawi Mehari
    Demisse, Belachew Asteray
    Haile, Abenezer Tariku
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [43] Integrating critical chain project management with last planner system for linear scheduling of modular construction
    Salama, Tarek
    Salah, Ahmad
    Moselhi, Osama
    CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (04): : 525 - 554
  • [44] Integrating critical chain project management with last planner system for linear scheduling of modular construction
    Salama, Tarek
    Salah, Ahmad
    Moselhi, Osama
    Construction Innovation, 2021, 21 (04): : 525 - 554
  • [45] The changing relationship between neurology and general practice in the UK
    Morrish, Paul
    BRITISH JOURNAL OF GENERAL PRACTICE, 2009, 59 (565): : 599 - 604
  • [46] Design-related questions in the construction phase: the effect of using the Last Planner System in design management
    Maki, Tarja
    Kerosuo, Hannele
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (02) : 132 - 139
  • [48] The Relationship Between Holistic Practice and 'Spiritual but not Religious' Identity in the UK
    Oake, Bethan Juliet
    SECULARISM & NONRELIGION, 2021, 10
  • [49] The Last Planner® System and Building Information Modeling in Construction Execution: From an Integrative Review to a Conceptual Model for Integration
    Schimanski, Christoph Paul
    Marcher, Carmen
    Monizza, Gabriele Pasetti
    Matt, Dominik T.
    APPLIED SCIENCES-BASEL, 2020, 10 (03):
  • [50] UK CONSTRUCTION AUTOMATION AND ROBOTICS - BRIDGING THE GAP BETWEEN RESEARCH AND PRACTICE
    VENABLES, R