Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control

被引:6
|
作者
Windt, K. [1 ]
Knollmann, M. [1 ]
机构
[1] Univ Bremen, Sch Engn & Sci, D-28359 Bremen, Germany
关键词
Production; Control; Simulation; CONTROL-THEORETIC ANALYSIS; PERFORMANCE; SYSTEMS;
D O I
10.1016/j.cirp.2014.03.112
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
If order due dates are missed, a frequent reaction of production planners is to adapt planned lead times. How often and to what extent updates are reasonable has previously been unclear because, while trying to improve logistic target achievement, the opposite effect may be caused, which is known as the Lead Time Syndrome of Production Control. This paper investigates correlations between Lead Time Syndrome variables using a control theoretic model to gain knowledge about system transient response and the influence of the lead time updating frequency and information delay on due date reliability. These investigations lead to fundamental improvements in practice in setting planning parameters. (C) 2014 CIRP.
引用
收藏
页码:405 / 408
页数:4
相关论文
共 50 条
  • [1] Dynamic planned lead times in production planning and control systems: does the lead time syndrome matter?
    Thurer, Matthias
    Fernandes, Nuno O.
    Haeussler, Stefan
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (04) : 1268 - 1282
  • [2] An Application of Master Schedule Smoothing and Planned Lead Time Control
    Teo, Chee-Chong
    Bhatnagar, Rohit
    Graves, Stephen C.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (02) : 211 - 223
  • [3] Lead time and response time in a pull production control system
    Kim, I
    Tang, CS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 101 (03) : 474 - 485
  • [4] Evaluation Of Capacity Control And Planned Lead Time Control In A Control-Theoretic Model
    Knollmann, Mathias
    Windt, Katja
    Duffie, Neil
    VARIETY MANAGEMENT IN MANUFACTURING: PROCEEDINGS OF THE 47TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2014, 17 : 392 - 397
  • [5] OPTIMUM PLANNED MAINTENANCE POLICIES WITH LEAD TIME
    KAIO, N
    OSAKI, S
    IEEE TRANSACTIONS ON RELIABILITY, 1981, 30 (01) : 79 - 80
  • [6] A PLANNED MAINTENANCE MODEL WITH LEAD TIME AND MINIMAL REPAIR
    KAIO, N
    OSAKI, S
    STOCHASTIC PROCESSES AND THEIR APPLICATIONS, 1985, 19 (01) : 47 - 47
  • [7] Operation lead time control
    Starbek, M
    Grum, J
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2000, 16 (06) : 443 - 450
  • [8] Planned lead time optimization in material requirement planning environment for multilevel production systems
    Hnaien, Faicel
    Dolgui, Alexandre
    Louly, Mohamed-Aly Ould
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2008, 17 (02) : 132 - 155
  • [9] Planned lead time optimization in material requirement planning environment for multilevel production systems
    Faicel Hnaien
    Alexandre Dolgui
    Mohamed-Aly Ould Louly
    Journal of Systems Science and Systems Engineering, 2008, 17 : 132 - 155
  • [10] PLANNED LEAD TIME OPTIMIZATION IN MATERIAL REQUIREMENT PLANNING ENVIRONMENT FOR MULTILEVEL PRODUCTION SYSTEMS
    Faicel HNAIEN
    Alexandre DOLGUI
    Mohamed-Aly OULD LOULY
    Journal of Systems Science and Systems Engineering, 2008, (02) : 132 - 155