An Application of Master Schedule Smoothing and Planned Lead Time Control

被引:18
|
作者
Teo, Chee-Chong [1 ]
Bhatnagar, Rohit [2 ]
Graves, Stephen C. [3 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore 639798, Singapore
[2] Nanyang Technol Univ, Nanyang Business Sch, Singapore 639798, Singapore
[3] MIT, Sloan Sch Management, Cambridge, MA 02139 USA
关键词
make-to-order; production smoothing; master production schedule; planned lead times; oil-rig building;
D O I
10.1111/j.1937-5956.2011.01263.x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Make-to-order (MTO) manufacturers must ensure concurrent availability of all parts required for production, as any unavailability may cause a delay in completion time. A major challenge for MTO manufacturers operating under high demand variability is to produce customized parts in time to meet internal production schedules. We present a case study of a producer of MTO offshore oil rigs that highlights the key aspects of the problem. The producer was faced with an increase in both demand and demand variability. Consequently, it had to rely heavily on subcontracting to handle production requirements that were in excess of its capacity. We focused on the manufacture of customized steel panels, which represent the main sub-assemblies for building an oil rig. We considered two key tactical parameters: the planning window of the master production schedule and the planned lead time of each workstation. Under the constraint of a fixed internal delivery lead time, we determined the optimal planning parameters. This improvement effort reduced the subcontracting cost by implementing several actions: the creation of a master schedule for each sub-assembly family of the steel panels, the smoothing of the master schedule over its planning window, and the controlling of production at each workstation by its planned lead time. We report our experience in applying the analytical model, the managerial insights gained, and how the application benefits the oil-rig producer.
引用
收藏
页码:211 / 223
页数:13
相关论文
共 50 条
  • [1] Setting planned lead times for a make-to-order production system with master schedule smoothing
    Teo, Chee-Chong
    Bhatnagar, Rohit
    Graves, Stephen C.
    IIE TRANSACTIONS, 2011, 43 (06) : 399 - 414
  • [2] Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control
    Windt, K.
    Knollmann, M.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2014, 63 (01) : 405 - 408
  • [3] Evaluation Of Capacity Control And Planned Lead Time Control In A Control-Theoretic Model
    Knollmann, Mathias
    Windt, Katja
    Duffie, Neil
    VARIETY MANAGEMENT IN MANUFACTURING: PROCEEDINGS OF THE 47TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2014, 17 : 392 - 397
  • [4] MASTER TIME SCHEDULE GENERATOR - ALGORITHMIC APPROACH
    HOLZMAN, AG
    OPERATIONS RESEARCH, 1975, 23 : B338 - B339
  • [5] Study on cost and schedule control in warship planned maintenance
    Xie Li
    Wei Ru Xiang
    Chen Zi Shang Chuan
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 87 - 90
  • [6] A study on production schedule control of long lead time key spare parts
    Ye, LP
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1374 - 1380
  • [7] Dynamic planned lead times in production planning and control systems: does the lead time syndrome matter?
    Thurer, Matthias
    Fernandes, Nuno O.
    Haeussler, Stefan
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (04) : 1268 - 1282
  • [8] Application Issues of Impacted As-Planned Schedule for Delay Analysis
    Kim, Kyong Ju
    Han, Bonghee
    Park, Min Seo
    Kim, Kyoungmin
    Kim, Eu Wang
    BUILDINGS, 2022, 12 (09)
  • [9] Lead time demand for simple exponential smoothing
    Snyder, RD
    Ord, JK
    Koehler, AB
    DECISION SCIENCES INSTITUTE 1998 PROCEEDINGS, VOLS 1-3, 1998, : 1151 - 1151
  • [10] OPTIMUM PLANNED MAINTENANCE POLICIES WITH LEAD TIME
    KAIO, N
    OSAKI, S
    IEEE TRANSACTIONS ON RELIABILITY, 1981, 30 (01) : 79 - 80