共 50 条
- [31] APPLICATION OF CONSTRUCTION SCHEDULE FOR MONITORING AND CONTROL OF CIVIL ENGENEERING PROJECTS ARCHIVES FOR TECHNICAL SCIENCES, 2015, (12): : 51 - 58
- [32] EVM Application in a Pipeline Project: Cost and New Schedule Control WWAI '08: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON WASTE MANAGEMENT, WATER POLLUTION, AIR POLLUTION, INDOOR CLIMATE, 2008, : 63 - 70
- [35] Planned lead time optimization in material requirement planning environment for multilevel production systems Journal of Systems Science and Systems Engineering, 2008, 17 : 132 - 155
- [39] APPLICATION OF LAGUERRE FUNCTIONS FOR APPROXIMATION AND SMOOTHING OF COUNT RATES VARYING WITH TIME INTERNATIONAL JOURNAL OF APPLIED RADIATION AND ISOTOPES, 1975, 26 (6-7): : 347 - 354