共 50 条
- [4] A ROBUST OPTIMIZATION APPROACH FOR PRODUCTION PLANNING UNDER EXOGENOUS PLANNED LEAD TIMES 2019 WINTER SIMULATION CONFERENCE (WSC), 2019, : 2312 - 2323
- [5] MULTILEVEL OPTIMIZATION IN THE PLANNING OF SYSTEMS ENGINEERING CYBERNETICS, 1979, 17 (04): : 43 - 48
- [6] Material Requirement Planning under Fuzzy Lead Times IFAC PAPERSONLINE, 2015, 48 (03): : 242 - 247
- [10] Lot sizing in material requirement planning (MRP) systems Proceedings of 2005 International Conference on Innovation & Management, 2005, : 776 - 779