Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control

被引:6
|
作者
Windt, K. [1 ]
Knollmann, M. [1 ]
机构
[1] Univ Bremen, Sch Engn & Sci, D-28359 Bremen, Germany
关键词
Production; Control; Simulation; CONTROL-THEORETIC ANALYSIS; PERFORMANCE; SYSTEMS;
D O I
10.1016/j.cirp.2014.03.112
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
If order due dates are missed, a frequent reaction of production planners is to adapt planned lead times. How often and to what extent updates are reasonable has previously been unclear because, while trying to improve logistic target achievement, the opposite effect may be caused, which is known as the Lead Time Syndrome of Production Control. This paper investigates correlations between Lead Time Syndrome variables using a control theoretic model to gain knowledge about system transient response and the influence of the lead time updating frequency and information delay on due date reliability. These investigations lead to fundamental improvements in practice in setting planning parameters. (C) 2014 CIRP.
引用
收藏
页码:405 / 408
页数:4
相关论文
共 50 条
  • [31] Online lead time prediction supporting situation-aware production control
    Gyulai, David
    Pfeiffer, Andras
    Bergmann, Julia
    Gallina, Viola
    6TH CIRP GLOBAL WEB CONFERENCE - ENVISAGING THE FUTURE MANUFACTURING, DESIGN, TECHNOLOGIES AND SYSTEMS IN INNOVATION ERA (CIRPE 2018), 2018, 78 : 190 - 195
  • [32] LEAD TIME AND INVENTORY CONTROL PROBLEM.
    Cawdery, M.N.
    1600, (27):
  • [33] Production Lots as Determinant of Paper Production Lead Time Performance
    Koskinen, Pekka
    Hilmola, Olli-Pekka
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2009, 2 (04) : 63 - 79
  • [34] Order Production Planning Based on Lead Time and Balanced Production
    Chen, Xin-lin
    Wang, Xiang-gang
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 994 - 998
  • [35] Lead-time oriented production control policies in two-machine production lines
    Aligius, Alessio
    Colledani, Marcello
    Horvath, Andras
    IFAC PAPERSONLINE, 2015, 48 (03): : 2399 - 2404
  • [36] Lead-time-oriented production control policies in two-machine production lines
    Angius, Alessio
    Colledani, Marcello
    Horvath, Andras
    IISE TRANSACTIONS, 2018, 50 (03) : 178 - 190
  • [37] Inventory and lead time planning with lead-time-sensitive demand
    Yang, Bibo
    Geunes, Joseph
    IIE TRANSACTIONS, 2007, 39 (05) : 439 - 452
  • [38] Dynamic lead time modeling for JIT production planning
    Caramanis, Michael C.
    Anli, Osman M.
    Proceedings - IEEE International Conference on Robotics and Automation, 1999, 2 : 1450 - 1455
  • [39] MRP performance effects due to lot size and planned lead time settings
    Enns, ST
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (03) : 461 - 480
  • [40] Production lead time improvement through lean manufacturing
    Gochel, Amdework
    Gebeyehu, Sisay G.
    Abebe, Muluken
    International Journal of Industrial and Systems Engineering, 2022, 40 (02) : 147 - 156