Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control

被引:6
|
作者
Windt, K. [1 ]
Knollmann, M. [1 ]
机构
[1] Univ Bremen, Sch Engn & Sci, D-28359 Bremen, Germany
关键词
Production; Control; Simulation; CONTROL-THEORETIC ANALYSIS; PERFORMANCE; SYSTEMS;
D O I
10.1016/j.cirp.2014.03.112
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
If order due dates are missed, a frequent reaction of production planners is to adapt planned lead times. How often and to what extent updates are reasonable has previously been unclear because, while trying to improve logistic target achievement, the opposite effect may be caused, which is known as the Lead Time Syndrome of Production Control. This paper investigates correlations between Lead Time Syndrome variables using a control theoretic model to gain knowledge about system transient response and the influence of the lead time updating frequency and information delay on due date reliability. These investigations lead to fundamental improvements in practice in setting planning parameters. (C) 2014 CIRP.
引用
收藏
页码:405 / 408
页数:4
相关论文
共 50 条
  • [41] Lead time reduction in small series and batch production
    Dombrowski U.
    Meyer P.
    Dix Y.
    Ortmeier C.
    Gallandt J.
    Schwarze W.
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2019, 114 (7-8): : 444 - 448
  • [42] Production lead time improvement through lean manufacturing
    Gebeyehu, Sisay G.
    Abebe, Muluken
    Gochel, Amdework
    COGENT ENGINEERING, 2022, 9 (01):
  • [43] A min-max solution to optimise planned lead time in a remanufacturing system
    Liu, Biyu
    Chen, Weida
    Segerstedt, Anders
    Yang, Haidong
    Zhang, Qinhong
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (02) : 485 - 506
  • [44] A rule for lead time estimation in general production shops
    Weng, Wei
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL CYBER PHYSICAL SYSTEMS (ICPS 2019), 2019, : 581 - 586
  • [45] Dynamic lead time modeling for JIT production planning
    Caramanis, MC
    Anli, OM
    ICRA '99: IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, PROCEEDINGS, 1999, : 1450 - 1455
  • [46] Demand and production management with uniform guaranteed lead time
    Rao, US
    Swaminathan, JM
    Zhang, J
    PRODUCTION AND OPERATIONS MANAGEMENT, 2005, 14 (04) : 400 - 412
  • [47] Coping with production time variability via dynamic lead-time quotation
    Kahvecioglu, Gokce
    Balcioglu, Baris
    OR SPECTRUM, 2016, 38 (04) : 877 - 898
  • [48] Coping with production time variability via dynamic lead-time quotation
    Gökçe Kahveciog̃lu
    Barış Balcıog̃lu
    OR Spectrum, 2016, 38 : 877 - 898
  • [49] Cellular Production Lines With Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control
    Meerkov, Semyon M.
    Yan, Chao-Bo
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (02) : 764 - 768
  • [50] A long lead time
    Ferry, Cliff
    PHI DELTA KAPPAN, 2007, 89 (01) : IBC - IBC