Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control

被引:6
|
作者
Windt, K. [1 ]
Knollmann, M. [1 ]
机构
[1] Univ Bremen, Sch Engn & Sci, D-28359 Bremen, Germany
关键词
Production; Control; Simulation; CONTROL-THEORETIC ANALYSIS; PERFORMANCE; SYSTEMS;
D O I
10.1016/j.cirp.2014.03.112
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
If order due dates are missed, a frequent reaction of production planners is to adapt planned lead times. How often and to what extent updates are reasonable has previously been unclear because, while trying to improve logistic target achievement, the opposite effect may be caused, which is known as the Lead Time Syndrome of Production Control. This paper investigates correlations between Lead Time Syndrome variables using a control theoretic model to gain knowledge about system transient response and the influence of the lead time updating frequency and information delay on due date reliability. These investigations lead to fundamental improvements in practice in setting planning parameters. (C) 2014 CIRP.
引用
收藏
页码:405 / 408
页数:4
相关论文
共 50 条
  • [21] A TIME TO LEAD
    TODD, MC
    CALIFORNIA MEDICINE, 1968, 108 (04): : 319 - &
  • [22] Time to Lead
    Lexa, Frank James
    JOURNAL OF THE AMERICAN COLLEGE OF RADIOLOGY, 2013, 10 (10) : 800 - 801
  • [23] Lead time
    Dormer, Myk
    ELECTRONICS WORLD, 2010, 116 (1895): : 8 - 8
  • [24] Lead Time
    Earis, Philip
    JOULE, 2018, 2 (07) : 1203 - 1204
  • [25] Planned lead time determination in a make-to-order remanufacturing system
    Tang, Ou
    Grubbstrom, Robert W.
    Zanoni, Simone
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 108 (1-2) : 426 - 435
  • [26] Data-driven model predictive control for real-time planned lead time optimization in a reconfigurable flow line
    Chen, Wenchong
    Rahman, Humyun Fuad
    Liu, Hongwei
    Fang, Mei
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [27] Customer order lead times for production based on lead time and tardiness costs
    Bertrand, JWM
    van Ooijen, HPG
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) : 257 - 265
  • [28] A TIME TO LEAD, A TIME TO FOLLOW
    CLEVER, LH
    WESTERN JOURNAL OF MEDICINE, 1991, 154 (04): : 468 - 468
  • [29] The Lead Time Syndrome of manufacturing control: comparison of two independent research approaches
    Bendul, Julia
    Knollmann, Mathias
    RESEARCH AND INNOVATION IN MANUFACTURING: KEY ENABLING TECHNOLOGIES FOR THE FACTORIES OF THE FUTURE - PROCEEDINGS OF THE 48TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2016, 41 : 81 - 86
  • [30] A study on production schedule control of long lead time key spare parts
    Ye, LP
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1374 - 1380