Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem

被引:46
|
作者
Ke, Hua [1 ]
Ma, Weimin [1 ]
Ni, Yaodong
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Time-cost trade-off; Chance-constrained programming; Dependent-chance programming; Stochastic programming; Genetic algorithm;
D O I
10.1016/j.amc.2009.05.004
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
In real-life projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost trade-off problem seldom concerns stochastic environments. Besides, optimizing the expected value of the objective is the exclusive decision-making criterion in the existing models for the stochastic time-cost trade-off problem. In this paper, two newly developed alternative stochastic time-cost trade-off models are proposed, in which the philosophies of chance-constrained programming and dependent-chance programming are adopted for decision-making. In addition, a hybrid intelligent algorithm integrating stochastic simulations and genetic algorithm is designed to search the quasi-optimal schedules under different decision-making criteria. The goal of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in stochastic environments. (C) 2009 Elsevier Inc. All rights reserved.
引用
收藏
页码:308 / 313
页数:6
相关论文
共 50 条
  • [31] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [32] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [33] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
  • [34] Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program
    Chen, Liangwei
    Zhang, Jingwen
    Peng, Wuliang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (07)
  • [35] A genetic algorithm approach for the time-cost trade-off in PERT networks
    Azaron, A
    Perkgoz, C
    Sakawa, M
    APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) : 1317 - 1339
  • [36] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [37] Time-cost trade-off in PERT networks using a genetic algorithm
    Azaron, A
    Perkgoz, C
    Kato, K
    Katagiri, H
    Sakawa, M
    2004 47TH MIDWEST SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL III, CONFERENCE PROCEEDINGS, 2004, : 57 - 60
  • [38] Using machine learning and GA to solve time-cost trade-off problems
    Li, Heng
    Cao, J.-N.
    Love, P.E.D.
    Journal of Construction Engineering and Management, 125 (05): : 347 - 353
  • [39] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [40] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716