A genetic algorithm approach for the time-cost trade-off in PERT networks

被引:59
|
作者
Azaron, A [1 ]
Perkgoz, C [1 ]
Sakawa, M [1 ]
机构
[1] Hiroshima Univ, Dept Artificial Complex Syst Engn, Grad Sch Engn, Higashihiroshima, Hiroshima 7398527, Japan
关键词
project management and scheduling; genetic algorithm; multiple objective programming; optimal control; design of experiments;
D O I
10.1016/j.amc.2004.10.021
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
We develop a multi-objective model for the time-cost trade-off problem in PERT networks with generalized Erlang distributions of activity durations, using a genetic algorithm. The mean duration of each activity is assumed to be a non-increasing function and the direct cost of each activity is assumed to be a non-decreasing function of the amount of resource allocated to it. The decision variables of the model are the allocated resource quantities. The problem is formulated as a multi-objective optimal control problem that involves four conflicting objective functions. The objective functions are the project direct cost (to be minimized), the mean of the project completion time (min), the variance of the project completion time (min), and the probability that the project completion time does not exceed a certain threshold (max). It is impossible to solve this problem optimally. Therefore, we apply a "Genetic Algorithm for Numerical Optimizations of Constrained Problems" (GENOCOP) to solve this multi-objective problem using a goal attainment technique. Several factorial experiments are performed to identify appropriate genetic algorithm parameters that produce the best results within a given execution time in the three typical cases with different configurations. Finally, we compare the genetic algorithm results against the results of a discrete-time approximation method for solving the original optimal control problem. (c) 2004 Elsevier Inc. All rights reserved.
引用
收藏
页码:1317 / 1339
页数:23
相关论文
共 50 条
  • [1] Time-cost trade-off in PERT networks using a genetic algorithm
    Azaron, A
    Perkgoz, C
    Kato, K
    Katagiri, H
    Sakawa, M
    [J]. 2004 47TH MIDWEST SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL III, CONFERENCE PROCEEDINGS, 2004, : 57 - 60
  • [2] A discrete-time approximation technique for the time-cost trade-off in pert networks
    Azaron, Amir
    Sakawa, Masatoshi
    Tavakkoli-Moghaddam, Reza
    Safaei, Nima
    [J]. RAIRO-OPERATIONS RESEARCH, 2007, 41 (01) : 61 - 81
  • [3] Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
    Azaron, Amir
    Tavakkoli-Moghaddam, Reza
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (03) : 1186 - 1200
  • [4] Time-cost trade-off via optimal control theory in Markov PERT networks
    Amir Azaron
    Hideki Katagiri
    Masatoshi Sakawa
    [J]. Annals of Operations Research, 2007, 150 : 47 - 64
  • [5] Time-cost trade-off via optimal control theory in Markov PERT networks
    Azaron, Amir
    Katagiri, Hideki
    Sakawa, Masatoshi
    [J]. ANNALS OF OPERATIONS RESEARCH, 2007, 150 (01) : 47 - 64
  • [6] A hybrid genetic algorithm for the discrete time-cost trade-off problem
    Sonmez, Rifat
    Bettemir, Onder Halis
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (13) : 11428 - 11434
  • [7] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    [J]. CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [8] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    [J]. JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [9] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    [J]. KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
  • [10] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    [J]. APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643