Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution

被引:0
|
作者
Feng, Yixiong [1 ]
Lin, Xiaohua [1 ]
Tan, Jianrong [1 ]
机构
[1] Zhejiang Univ, State Key Lab Fluid Power & Mechatron Syst, Hangzhou 310027, Zhejiang, Peoples R China
来源
关键词
Product management; chance constrained programming; random simulation; genetic algorithm; PROGRAMMING SOLUTION;
D O I
10.12785/amis/070230
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
As the fact that renewable resources were used in majority projects in modern enterprises, the classic time-cost trade-off problem was extended and a new resource-constrained time-cost trade-off problem based on random chance constrained programming was proposed, where the renewable resources were emphasized. The project cost was calculated based on renewable resources. Each activity could be implemented with compressed manner in which the renewable resources were devoted to shorten the activity duration. According to the characteristics of the model, an genetic algorithm based on random simulation technique was presented to solve this model. Finally, the practical example verified the validity of the model and effectiveness of the proposed algorithm.
引用
收藏
页码:639 / 643
页数:5
相关论文
共 50 条
  • [1] A hybrid genetic algorithm for the discrete time-cost trade-off problem
    Sonmez, Rifat
    Bettemir, Onder Halis
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (13) : 11428 - 11434
  • [2] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    [J]. CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [3] Network analysis algorithm for the solution of discrete time-cost trade-off problem
    Önder Halis Bettemir
    M. Talat Birgönül
    [J]. KSCE Journal of Civil Engineering, 2017, 21 : 1047 - 1058
  • [4] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058
  • [5] Multi-Resource Constrained Discrete Time/Cost Trade-off Problem and Its Improved Genetic Algorithm
    Zhang Jing-wen
    Shan Hui-fang
    [J]. 2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2010, : 123 - 128
  • [6] Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer
    Zou, Haobo
    Zhou, Guohua
    [J]. JOURNAL OF INTERNET TECHNOLOGY, 2021, 22 (01): : 197 - 207
  • [7] A FLOW-PRESERVING ALGORITHM FOR THE TIME-COST TRADE-OFF PROBLEM
    TUFEKCI, S
    [J]. IIE TRANSACTIONS, 1982, 14 (02) : 109 - 113
  • [8] Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem
    Sonmez, Rifat
    Iranagh, Mahdi Abbasi
    Uysal, Furkan
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
  • [9] A genetic algorithm approach for the time-cost trade-off in PERT networks
    Azaron, A
    Perkgoz, C
    Sakawa, M
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) : 1317 - 1339
  • [10] Time-cost trade-off in PERT networks using a genetic algorithm
    Azaron, A
    Perkgoz, C
    Kato, K
    Katagiri, H
    Sakawa, M
    [J]. 2004 47TH MIDWEST SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL III, CONFERENCE PROCEEDINGS, 2004, : 57 - 60