Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution

被引:0
|
作者
Feng, Yixiong [1 ]
Lin, Xiaohua [1 ]
Tan, Jianrong [1 ]
机构
[1] Zhejiang Univ, State Key Lab Fluid Power & Mechatron Syst, Hangzhou 310027, Zhejiang, Peoples R China
来源
关键词
Product management; chance constrained programming; random simulation; genetic algorithm; PROGRAMMING SOLUTION;
D O I
10.12785/amis/070230
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
As the fact that renewable resources were used in majority projects in modern enterprises, the classic time-cost trade-off problem was extended and a new resource-constrained time-cost trade-off problem based on random chance constrained programming was proposed, where the renewable resources were emphasized. The project cost was calculated based on renewable resources. Each activity could be implemented with compressed manner in which the renewable resources were devoted to shorten the activity duration. According to the characteristics of the model, an genetic algorithm based on random simulation technique was presented to solve this model. Finally, the practical example verified the validity of the model and effectiveness of the proposed algorithm.
引用
收藏
页码:639 / 643
页数:5
相关论文
共 50 条
  • [31] Time-cost trade-off analysis of a priority based assignment problem
    Prabhjot Kaur
    Kalpana Dahiya
    Vanita Verma
    [J]. OPSEARCH, 2021, 58 : 448 - 482
  • [32] A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling
    Pawinski, Grzegorz
    Sapiecha, Krzysztof
    [J]. FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 171 - 179
  • [33] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    [J]. SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [34] A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
    Zareei, Mostafa
    Hassan-Pour, Hossein Ali
    [J]. IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2015, 8 (04) : 653 - 685
  • [35] The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook
    Hosseinpour, Maedeh
    Roghanian, Emad
    Weber, Gerhard-Wilhelm
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2023, 8 (03) : 141 - 164
  • [36] Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
    Anagnostopoulos, K. P.
    Kotsikas, L.
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (01) : 260 - 270
  • [37] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times
    Ma, Weimin
    Ke, Hua
    [J]. FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
  • [38] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [39] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [40] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16