共 50 条
- [31] Time-cost trade-off analysis of a priority based assignment problem [J]. OPSEARCH, 2021, 58 : 448 - 482
- [32] A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling [J]. FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 171 - 179
- [33] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS [J]. SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
- [37] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times [J]. FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
- [39] Time-cost trade-off of construction project based on ant colony algorithm [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111