Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution

被引:0
|
作者
Feng, Yixiong [1 ]
Lin, Xiaohua [1 ]
Tan, Jianrong [1 ]
机构
[1] Zhejiang Univ, State Key Lab Fluid Power & Mechatron Syst, Hangzhou 310027, Zhejiang, Peoples R China
来源
关键词
Product management; chance constrained programming; random simulation; genetic algorithm; PROGRAMMING SOLUTION;
D O I
10.12785/amis/070230
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
As the fact that renewable resources were used in majority projects in modern enterprises, the classic time-cost trade-off problem was extended and a new resource-constrained time-cost trade-off problem based on random chance constrained programming was proposed, where the renewable resources were emphasized. The project cost was calculated based on renewable resources. Each activity could be implemented with compressed manner in which the renewable resources were devoted to shorten the activity duration. According to the characteristics of the model, an genetic algorithm based on random simulation technique was presented to solve this model. Finally, the practical example verified the validity of the model and effectiveness of the proposed algorithm.
引用
收藏
页码:639 / 643
页数:5
相关论文
共 50 条