The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook

被引:3
|
作者
Hosseinpour, Maedeh [1 ]
Roghanian, Emad [1 ]
Weber, Gerhard-Wilhelm [2 ]
机构
[1] KN Toosi Univ Technol, Dept Ind Engn, Tehran, Iran
[2] Poznan Univ Tech, Dept Engn Management, Poznan, Poland
关键词
Time-Cost Optimization; Trade-off; Project Scheduling; Multi-Objective Planning; PARTICLE SWARM OPTIMIZATION; PROJECT SCHEDULING PROBLEM; DECISION-MAKING MODEL; DISCRETE-TIME; QUALITY TRADE; GENETIC ALGORITHM; CONSTRUCTION TIME; NEURAL-NETWORK; UNCERTAINTY; ROBUSTNESS;
D O I
10.5267/j.jpm.2023.4.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The time-cost optimization is amongst the most critical fields, which has an extensive range of implementation in project scheduling. Achieving a satisfactory balance between these factors can lead to an efficient construction project by reducing both the length of the project and costs at the same time. An effective balance can be achieved using various methods, depending on the situation. This study aims to incorporate the various algorithms used in the last 15 years to reach a satisfying balance between time and cost, including meta-heuristics, heuristics, and exact algorithms. A comprehensive view of the problems associated with time-cost optimization will be provided throughout this review to assist new and challenging researchers who are interested in this type of research. For this purpose, we have reviewed some objective functions and uncertainty techniques that could be employed in time-cost balancing problems. The literature review tables contain a variety of columns, including uncertainties such as fuzzy, probabilistic, interval, robust, and objective functions, along with cost and time, for the investigation of various types of balance issues. In the conclusion of this article, we will show the results of our literature review table using different types of graphic diagrams. For each main column of the table, we will show various types of diagrams to make the results easier to understand. (c) 2023 Growing Science Ltd. All rights reserved.
引用
收藏
页码:141 / 164
页数:24
相关论文
共 50 条
  • [1] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [2] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    [J]. ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [3] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    [J]. JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [4] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    [J]. Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [5] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [6] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    [J]. APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [7] A FLOW-PRESERVING ALGORITHM FOR THE TIME-COST TRADE-OFF PROBLEM
    TUFEKCI, S
    [J]. IIE TRANSACTIONS, 1982, 14 (02) : 109 - 113
  • [8] Time-cost trade-off in a multi-choice assignment problem
    Singh, Shalabh
    Singh, Sonia
    [J]. ENGINEERING OPTIMIZATION, 2022, 54 (04) : 576 - 592
  • [9] A hybrid genetic algorithm for the discrete time-cost trade-off problem
    Sonmez, Rifat
    Bettemir, Onder Halis
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (13) : 11428 - 11434
  • [10] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262