Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times

被引:3
|
作者
Ma, Weimin [1 ]
Ke, Hua [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
time-cost trade-off; credibility theory; fuzzy programming; genetic algorithm;
D O I
10.1109/COINFO.2009.44
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The time-cost trade-off problem is a type of the project scheduling problem which studies how to modify project activities so as to achieve the trade-off between the project cost and the completion time. In real projects, the trade-off between project cost and project completion time, and the uncertainty of the environment are both considerable aspects for decision-makers. In this paper, an expected value model for the fuzzy time-cost trade-off problem is proposed, in which credibility theory is applied to describe the uncertainty of activity duration times. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedules.
引用
收藏
页码:344 / 347
页数:4
相关论文
共 50 条
  • [1] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    [J]. Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [2] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [3] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
  • [4] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    [J]. APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85
  • [5] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [6] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [7] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    [J]. ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [8] Efficient modeling of time-cost trade-off problem by eliminating redundant paths
    Ammar, Mohammad A.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 812 - 821
  • [9] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    [J]. JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [10] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701