Modeling project time-cost trade-off in fuzzy random environment

被引:30
|
作者
Ke, Hua [1 ]
Ma, Junjie [2 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
[2] Tongji Univ, Sch Law, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Time-cost trade-off; Fuzzy random theory; Fuzzy random simulation; Genetic algorithm; SCHEDULING PROBLEM; SETS THEORY; ALGORITHM; GA;
D O I
10.1016/j.asoc.2014.01.040
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In real projects, the trade-off between the project cost and the project completion time, and the environmental uncertainty are aspects of considerable importance for managers. For complex environment with more than one type of uncertainty, this paper presents three types of time-cost trade-off models, in which the project environment is described via introducing the fuzzy random theory. The expected value and the chance measure of fuzzy random variable are introduced for modeling the problem under different decision-making criteria. After that, this paper is devoted to designing a searching method integrating the technique of fuzzy random simulations and genetic algorithm for searching the quasi-optimal schedules. Finally, some numerical examples are given to demonstrate the effectiveness of the designed method for solving the proposed models. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:80 / 85
页数:6
相关论文
共 50 条
  • [1] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [2] Time-cost trade-off analysis of project networks in fuzzy environments
    Chen, Shih-Pin
    Tsai, Ming-Jiun
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) : 386 - 397
  • [3] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times
    Ma, Weimin
    Ke, Hua
    [J]. FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
  • [4] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    [J]. Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [5] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach
    Glisovic, Natasa
    [J]. ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126
  • [6] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    [J]. Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [7] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [8] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    [J]. JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [9] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [10] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    [J]. 2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +