Time-Cost Trade-off Problems of Engineering Project with Running Income

被引:0
|
作者
Li, Hongxian [1 ]
Ouyang, Hongxiang [1 ]
机构
[1] Hohai Univ, Sch Business, Dept Engn & Project Management, Nanjing, Peoples R China
关键词
schedule; TCTP; optimization; genetic algorithms (GA);
D O I
10.1109/ICRMEM.2008.10
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
For an engineering project with running income, the result of time-cost trade-off problems (TCTP) concerning construction duration is only partly optimal. More cash flow happens during the running period, and the final goal of clients is to obtain the maximal profit across the lifecycle of engineering projects. In some situations, the cost of compressing construction duration even exceeds the increase of income of running period. Therefore, there should he an optimal scheme with the whole profit maximum. The relationship between the income of running period and the construction duration is analyzed in this paper; with the time value of capital taken into account, the mathematic model of TCTP across the running period is developed. Furthermore, the improved genetic algorithms (GA) proposed in this paper are applied to optimize the model. In the end, an example is given to testify the validity of the TCTP across the running period with the time value of capital considered.
引用
收藏
页码:9 / +
页数:2
相关论文
共 50 条
  • [1] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [2] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    [J]. JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [3] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [4] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    [J]. APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85
  • [5] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [6] Time-cost trade-off analysis of project networks in fuzzy environments
    Chen, Shih-Pin
    Tsai, Ming-Jiun
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) : 386 - 397
  • [7] Project time-cost trade-off optimization by maximal flow theory
    Liu, JM
    Rahbar, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 607 - 609
  • [8] TIME-COST TRADE-OFF ANALYSIS IN SOME CONSTRAINED ASSIGNMENT PROBLEMS
    GEETHA, S
    VARTAK, MN
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (01) : 97 - 101
  • [9] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [10] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243