Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times

被引:3
|
作者
Ma, Weimin [1 ]
Ke, Hua [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
time-cost trade-off; credibility theory; fuzzy programming; genetic algorithm;
D O I
10.1109/COINFO.2009.44
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The time-cost trade-off problem is a type of the project scheduling problem which studies how to modify project activities so as to achieve the trade-off between the project cost and the completion time. In real projects, the trade-off between project cost and project completion time, and the uncertainty of the environment are both considerable aspects for decision-makers. In this paper, an expected value model for the fuzzy time-cost trade-off problem is proposed, in which credibility theory is applied to describe the uncertainty of activity duration times. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedules.
引用
收藏
页码:344 / 347
页数:4
相关论文
共 50 条
  • [41] Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem
    Aminbakhsh, Saman
    Sonmez, Rifat
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (01)
  • [42] Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty
    Ouyang Yong-liu
    Zhang Meng-xiang
    Han Lu
    Lu Yi
    [J]. 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 282 - 292
  • [43] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [44] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [45] An evolutionary stochastic discrete time-cost trade-off method
    Hussein, Bahaa
    Moselhi, Osama
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (07) : 581 - 600
  • [46] Modeling a Conceptual framework for owner- contractor relationship and time-cost trade-off using fuzzy logic technique
    Al Hazza, Muataz Hazza F.
    Al Fadel, Mohammad
    Adesta, Erry Yulian Triblas
    [J]. 3RD INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER SCIENCE APPLICATIONS AND TECHNOLOGIES ACSAT 2014, 2014, : 179 - 183
  • [47] A note on time-cost trade-off in a fixed charge bi-criterion transportation problem
    Thirwani, D
    Arora, SR
    [J]. FIRST INTERNATIONAL CONFERENCE ON OPERATIONS AND QUANTITATIVE MANAGEMENT, VOL 1 AND 2, 1997, : 111 - 118
  • [48] Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Ni, Yaodong
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2009, 215 (01) : 308 - 313
  • [49] Optimizing time-cost trade-off decisions in an interval transportation problem with multiple shipment options
    Singh, Shalabh
    [J]. ENGINEERING OPTIMIZATION, 2023, 55 (01) : 53 - 70
  • [50] The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook
    Hosseinpour, Maedeh
    Roghanian, Emad
    Weber, Gerhard-Wilhelm
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2023, 8 (03) : 141 - 164