Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty

被引:0
|
作者
Ouyang Yong-liu [1 ]
Zhang Meng-xiang [1 ]
Han Lu [1 ]
Lu Yi [1 ]
机构
[1] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
construction project; fuzzy uncertainty; genetic algorithm; multiproject time -cost trade-off scheduling problem; MULTICRITERIA DECISION-MAKING; GENETIC ALGORITHM; OPTIMIZATION;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper presents a multiproject time-cost trade-off scheduling problem (mPTCTSP) for large-scale construction systems with multiple modes under fuzzy environment. A multiobjective decision making model is established in the total project duration which is regarded as a fuzzy variable. The fuzzy numbers in the model are defuzzified by using an expected value operator with an optimistic-pessimistic index. The multiobjective fuzzy optimization model designed in this study aims to simultaneously minimize project duration and delaying punishment cost. Furthermore, the hybrid genetic algorithm with fuzzy logic controller (flc-hGA) is developed to find feasible solutions. Finally, the Jinping-II Hydroelectric Project is used as a practical example to demonstrate the practicality and efficiency of the model.
引用
收藏
页码:282 / 292
页数:11
相关论文
共 50 条
  • [1] Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling
    Liu, Dian
    Li, Heng
    Wang, Hongwei
    Qi, Chao
    Rose, Timothy
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2020, 148 (148)
  • [2] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    [J]. SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [3] Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems
    Agdas, Duzgun
    Warne, David J.
    Osio-Norgaard, Jorge
    Masters, Forrest J.
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (01)
  • [4] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    [J]. Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [5] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [6] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    [J]. Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [7] Discrete particle swarm optimization method for the large-scale discrete time-cost trade-off problem
    Aminbakhsh, Saman
    Sonmez, Rifat
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 51 : 177 - 185
  • [8] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
  • [9] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [10] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637