共 50 条
- [21] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
- [22] Using ant colony algorithm to solve construction time-cost trade-off problem Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
- [23] Time-cost trade-off of construction project based on ant colony algorithm Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
- [24] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
- [25] Construction time-cost trade-off analysis using ant colony optimization algorithm PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
- [29] A fuzzy time-cost trade-off problem with credibility theory concepts PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
- [30] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20