Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off

被引:60
|
作者
Xiong, Ying [1 ]
Kuang, Yaping [2 ,3 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Beijing 100044, Peoples R China
[2] Zhejiang Univ, Sch Civil Engn & Architecture, Hangzhou 310027, Peoples R China
[3] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
Algorithms; Cost control; Optimization; Project management; Time factors;
D O I
10.1061/(ASCE)0733-9364(2008)134:2(153)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The time-cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a combinatorial optimization problem. This technical note employed an evolutionary algorithm-ant colony optimization (ACO) algorithm to deal with the time-cost trade-off problems. Combining with the modified adaptive weight approach, the ACO algorithm can find out the optimal solutions, and define the Pareto front as well. The development of the ACO-based multiobjective approach in this technical note provides an attractive alternative to solving construction time-cost optimization.
引用
收藏
页码:153 / 156
页数:4
相关论文
共 50 条
  • [1] Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    Zheng, DXM
    Ng, ST
    Kumaraswamy, MM
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) : 168 - 176
  • [2] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [3] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    [J]. PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [4] Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization
    Afshar, A.
    Ziaraty, A. Kasaeian
    Kaveh, A.
    Sharifi, F.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) : 668 - 674
  • [5] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    [J]. Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [6] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [7] Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    Zheng, DXM
    Ng, ST
    Kumaraswamy, MM
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (01) : 81 - 91
  • [8] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    [J]. TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
  • [9] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [10] A genetic algorithm approach for the time-cost trade-off in PERT networks
    Azaron, A
    Perkgoz, C
    Sakawa, M
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) : 1317 - 1339