共 50 条
- [1] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization [J]. KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
- [3] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO [J]. REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
- [6] Construction time-cost trade-off analysis using ant colony optimization algorithm [J]. PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
- [8] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
- [9] Time-Cost Trade-Off Optimization with a New Initial Population Approach [J]. TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
- [10] Project time-cost trade-off scheduling: a hybrid optimization approach [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822