A Bi-objective green tugboat scheduling problem with the tidal port time windows

被引:19
|
作者
Zhong, Huiling [1 ]
Zhang, Yugang [1 ]
Gu, Yimiao [1 ]
机构
[1] South China Univ Technol, Dept Elect Business, Guangzhou, Peoples R China
关键词
Green tugboat scheduling; Time windows; Multi-objective optimization; Non-dominated sorting genetic algorithm II; QUAY CRANE ASSIGNMENT; MULTIOBJECTIVE OPTIMIZATION; BERTH ALLOCATION; ALGORITHM;
D O I
10.1016/j.trd.2022.103409
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Tugboat assistance is essential when large ships are berthing and unberthing, and requires ports to produce efficient tugboat schedules considering various constraints. Few studies optimize tugboat scheduling from multiple vectors simultaneously, however. This paper thus constructs a bi-objective, mixed-integer linear programming, green tugboat scheduling model in order to minimize the maximum completion time and total fuel consumption, which improves port service levels, decreases tugboat company operating expenditures and thus environmental pollution emissions. The proposed model also considers the time window characteristics of the tidal port. We use the non-dominated sorting genetic algorithm II (NSGA-II) framework integrating the characteristics of tugboat scheduling to solve the model. Finally, we make a case study about Guangzhou Port to validate the model and the algorithm via a comparison of results solved by NSGA-II and CPLEX solver. The Pareto fronts obtained show the trade-off relationship between the two objectives, and provide a basis for port tugboat scheduling plans.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier
    Zandi, Arash
    Ramezanian, Reza
    Monplaisir, Leslie
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (06) : 967 - 978
  • [22] A bi-objective optimization for flow shop group scheduling problem with sequence dependent setup time
    Sekkal, Djazia Nadjat
    Belkaid, Faycal
    2022 14TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA2022), 2022, : 560 - 566
  • [23] Bi-Objective Optimization of a Flow Shop Scheduling Problem Under Time-of-Use Tariffs
    Wang, Xinyue
    Chu, Feng
    Ren, Tao
    Bai, Danyu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,
  • [24] A bi-objective time-dependent vehicle routing and scheduling problem for hazardous materials distribution
    Androutsopoulos, Konstantinos N.
    Zografos, Konstantinos G.
    EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2012, 1 (1-2) : 157 - 183
  • [25] Metaheuristic approach proposal for the solution of the bi-objective course scheduling problem
    Can, E.
    Ustun, O.
    Saglam, S.
    SCIENTIA IRANICA, 2023, 30 (04) : 1435 - 1449
  • [26] Bi-objective single machine scheduling problem with stochastic processing times
    Ali Salmasnia
    Mostafa Khatami
    Reza Baradaran Kazemzadeh
    Seyed Hessameddin Zegordi
    TOP, 2015, 23 : 275 - 297
  • [27] Bi-objective Optimization for Joint Production Scheduling and Distribution Problem with Sustainability
    Yagmur, Ece
    Kesen, Saadettin Erhan
    COMPUTATIONAL LOGISTICS (ICCL 2021), 2021, 13004 : 269 - 281
  • [28] Bi-objective single machine scheduling problem with stochastic processing times
    Salmasnia, Ali
    Khatami, Mostafa
    Kazemzadeh, Reza Baradaran
    Zegordi, Seyed Hessameddin
    TOP, 2015, 23 (01) : 275 - 297
  • [29] Modeling and solving for bi-objective cutting parallel machine scheduling problem
    Meng, Ronghua
    Rao, Yunqing
    Luo, Qiang
    ANNALS OF OPERATIONS RESEARCH, 2020, 285 (1-2) : 223 - 245
  • [30] Modeling and solving for bi-objective cutting parallel machine scheduling problem
    Ronghua Meng
    Yunqing Rao
    Qiang Luo
    Annals of Operations Research, 2020, 285 : 223 - 245