A bi-objective optimization for flow shop group scheduling problem with sequence dependent setup time

被引:0
|
作者
Sekkal, Djazia Nadjat [1 ]
Belkaid, Faycal [1 ]
机构
[1] Univ Tlemcen, Mfg Engn Lab Tlemcen, Tilimsen, Algeria
关键词
A bi-objective approach; flow shop group scheduling; learning effect; makespan; energy consumption;
D O I
10.1109/LOGISTIQUA55056.2022.9938059
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The minimization of makespan as an indicator of productivity and service level by using learning effect and high cadences during the production and transportation of products leads to an increase in energy consumption that has a negative effect on the environment and contributes to climate change. A bi-objective mixed integer linear programming model is developed in order to join the two objectives into one using the LP-metric method. Based on a real case study of the flow shop sequence dependent group scheduling problem, several experiments are carried out using different learning rates and varying the weights of the two objective functions in order to support the decision-maker in his operational and tactical choices.
引用
收藏
页码:560 / 566
页数:7
相关论文
共 50 条
  • [1] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers
    Abyaneh, Sina Hakimzadeh
    Zandieh, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4): : 309 - 325
  • [2] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers
    Sina Hakimzadeh Abyaneh
    M. Zandieh
    The International Journal of Advanced Manufacturing Technology, 2012, 58 : 309 - 325
  • [3] A multi-objective optimization algorithm for flow shop group scheduling problem with sequence dependent setup time and worker learning
    Sekkal, Djazia Nadjat
    Belkaid, Faycal
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 233
  • [4] Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics
    M. Fadaei
    M. Zandieh
    Arabian Journal for Science and Engineering, 2013, 38 : 2233 - 2244
  • [5] Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics
    Fadaei, M.
    Zandieh, M.
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38 (08) : 2233 - 2244
  • [6] Bi-Objective Optimization of a Flow Shop Scheduling Problem Under Time-of-Use Tariffs
    Wang, Xinyue
    Chu, Feng
    Ren, Tao
    Bai, Danyu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,
  • [7] Bi-criteria group scheduling with sequence-dependent setup time in a flow shop
    Lu, D.
    Logendran, R.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (04) : 530 - 546
  • [8] Comparison of two Meta-Heuristics for the Bi-Objective Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Times
    Sacramento, Joao
    Pedrosa, Joao
    Chibeles-Martins, Nelson
    Pinto-Varela, Tania
    30TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A-C, 2020, 48 : 181 - 186
  • [9] A bi-objective MILP model for an open-shop scheduling problem with reverse flows and sequence-dependent setup times
    Aghighi, Saba
    Mehdizadeh, Esmaeil
    Niaki, Seyed Taghi Akhavan
    Najafi, Amir Abbas
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (03) : 433 - 468
  • [10] A simheuristic for bi-objective stochastic permutation flow shop scheduling problem
    Maria Gonzalez-Neira, Eliana
    Rafael Montoya-Torres, Jairo
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 57 - 80