Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers

被引:0
|
作者
Sina Hakimzadeh Abyaneh
M. Zandieh
机构
[1] Mazandaran University of Science and Technology,Department of Industrial Engineering
[2] Shahid Beheshti University,Department of Industrial Management, Management and Accounting Faculty
[3] G.C.,undefined
关键词
Bi-objective optimization; Hybrid flow shop scheduling; Limited buffer space; Sequence-dependent setup times;
D O I
暂无
中图分类号
学科分类号
摘要
The bi-objective hybrid flow shop problem with sequence-dependent setup times and limited buffers is mentioned in this paper. In this environment, there are limited buffer spaces between any two successive stages; thus, maybe there is not enough room for queues of jobs that are waiting in the system for their next operations. This problem is shown to be NP-hard in the strong sense. Up to now, some heuristic and metaheuristic approaches are proposed to minimize makespan or total tardiness of jobs. This paper presents several methods for optimization which consider two objectives simultaneously. The resolution of several specific instances from the open literature with the adaptations of non-dominated sorting genetic algorithm and sub-population genetic algorithm suggest that the proposed algorithms are effective and useful methods for solving this problem.
引用
收藏
页码:309 / 325
页数:16
相关论文
共 50 条
  • [1] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers
    Abyaneh, Sina Hakimzadeh
    Zandieh, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4): : 309 - 325
  • [2] Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics
    M. Fadaei
    M. Zandieh
    Arabian Journal for Science and Engineering, 2013, 38 : 2233 - 2244
  • [3] Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics
    Fadaei, M.
    Zandieh, M.
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38 (08) : 2233 - 2244
  • [4] Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling with sequence-dependent setup times
    Mousavi, S. M.
    Zandieh, M.
    Amiri, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2570 - 2591
  • [5] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    Mathematical Problems in Engineering, 2022, 2022
  • [6] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [7] A bi-objective MILP model for an open-shop scheduling problem with reverse flows and sequence-dependent setup times
    Aghighi, Saba
    Mehdizadeh, Esmaeil
    Niaki, Seyed Taghi Akhavan
    Najafi, Amir Abbas
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (03) : 433 - 468
  • [8] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    Journal of Scheduling, 2014, 17 : 353 - 370
  • [9] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370
  • [10] A cooperative adaptive genetic algorithm for reentrant hybrid flow shop scheduling with sequence-dependent setup time and limited buffers
    Qianqian Zheng
    Yu Zhang
    Hongwei Tian
    Lijun He
    Complex & Intelligent Systems, 2024, 10 : 781 - 809