Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers

被引:0
|
作者
Sina Hakimzadeh Abyaneh
M. Zandieh
机构
[1] Mazandaran University of Science and Technology,Department of Industrial Engineering
[2] Shahid Beheshti University,Department of Industrial Management, Management and Accounting Faculty
[3] G.C.,undefined
关键词
Bi-objective optimization; Hybrid flow shop scheduling; Limited buffer space; Sequence-dependent setup times;
D O I
暂无
中图分类号
学科分类号
摘要
The bi-objective hybrid flow shop problem with sequence-dependent setup times and limited buffers is mentioned in this paper. In this environment, there are limited buffer spaces between any two successive stages; thus, maybe there is not enough room for queues of jobs that are waiting in the system for their next operations. This problem is shown to be NP-hard in the strong sense. Up to now, some heuristic and metaheuristic approaches are proposed to minimize makespan or total tardiness of jobs. This paper presents several methods for optimization which consider two objectives simultaneously. The resolution of several specific instances from the open literature with the adaptations of non-dominated sorting genetic algorithm and sub-population genetic algorithm suggest that the proposed algorithms are effective and useful methods for solving this problem.
引用
收藏
页码:309 / 325
页数:16
相关论文
共 50 条
  • [21] Hybrid genetic algorithm for job shop scheduling with sequence-dependent setup times
    Zhou, H.
    Zhang, H.M.
    Hangkong Xuebao/Acta Aeronautica et Astronautica Sinica, 2001, 22 (02): : 180 - 183
  • [22] A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates
    Noori-Darvish, Samane
    Mahdavi, Iraj
    Mahdavi-Amiri, Nezam
    APPLIED SOFT COMPUTING, 2012, 12 (04) : 1399 - 1416
  • [23] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    V. Anjana
    R. Sridharan
    P. N. Ram Kumar
    Journal of Scheduling, 2020, 23 : 49 - 69
  • [24] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    Anjana, V.
    Sridharan, R.
    Kumar, P. N.
    JOURNAL OF SCHEDULING, 2020, 23 (01) : 49 - 69
  • [25] Scheduling flowshops with finite buffers and sequence-dependent setup times
    Norman, Bryan A.
    Computers and Industrial Engineering, 1999, 36 (01): : 163 - 177
  • [26] A dual-criteria flow shop scheduling with sequence-dependent setup times
    Nailwal, Kewal Krishan
    Gupta, Deepak
    Sharma, Sameer
    JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2015, 36 (05): : 485 - 500
  • [27] A hybrid genetic algorithm for the hybrid flow shop scheduling problem with machine blocking and sequence-dependent setup times
    Ferreira Maciel, Ingrid Simoes
    Prata, Bruno de Athayde
    Nagano, Marcelo Seido
    de Abreu, Levi Ribeiro
    JOURNAL OF PROJECT MANAGEMENT, 2022, : 201 - 216
  • [28] Scheduling job shop problems with sequence-dependent setup times
    Naderi, B.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (21) : 5959 - 5976
  • [29] An immune algorithm for hybrid flow shop scheduling problem with time lags and sequence-dependent setup times
    Javadian, Nikbakhsh
    Fattahi, Parviz
    Farahmand-Mehr, Mohammad
    Amiri-Aref, Mehdi
    Kazemi, Mohammad
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 63 (1-4): : 337 - 348
  • [30] An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
    Zandieh, M.
    Gholami, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (24) : 6999 - 7027