A bi-objective optimization for flow shop group scheduling problem with sequence dependent setup time

被引:0
|
作者
Sekkal, Djazia Nadjat [1 ]
Belkaid, Faycal [1 ]
机构
[1] Univ Tlemcen, Mfg Engn Lab Tlemcen, Tilimsen, Algeria
关键词
A bi-objective approach; flow shop group scheduling; learning effect; makespan; energy consumption;
D O I
10.1109/LOGISTIQUA55056.2022.9938059
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The minimization of makespan as an indicator of productivity and service level by using learning effect and high cadences during the production and transportation of products leads to an increase in energy consumption that has a negative effect on the environment and contributes to climate change. A bi-objective mixed integer linear programming model is developed in order to join the two objectives into one using the LP-metric method. Based on a real case study of the flow shop sequence dependent group scheduling problem, several experiments are carried out using different learning rates and varying the weights of the two objective functions in order to support the decision-maker in his operational and tactical choices.
引用
收藏
页码:560 / 566
页数:7
相关论文
共 50 条
  • [11] On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time
    Said Aqil
    Karam Allali
    Annals of Operations Research, 2021, 296 : 615 - 637
  • [12] On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time
    Aqil, Said
    Allali, Karam
    ANNALS OF OPERATIONS RESEARCH, 2021, 296 (1-2) : 615 - 637
  • [13] Multi-Objective Optimization Flow Shop Scheduling Problem Solving the Makespan and Total Flow Time with Sequence Independent Setup Time
    Sadki, Hajar
    Aqil, Said
    Belabid, Jabrane
    Allali, Karam
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2024, 23 (01) : 163 - 184
  • [14] A Bi-objective Scheduling Model for Additive Manufacturing with Multiple Materials and Sequence-Dependent Setup Time
    Tavakkoli-Moghaddam, Reza
    Shirazian, Shadi
    Vahedi-Nouri, Behdin
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: TOWARDS SMART AND DIGITAL MANUFACTURING, PT II, 2020, 592 : 451 - 459
  • [15] An Immune-PSO Algorithm for Bi-objective Flow Shop Scheduling Problem
    Chang Junlin
    Liang Junyan
    Wei Wei
    2011 30TH CHINESE CONTROL CONFERENCE (CCC), 2011, : 2115 - 2118
  • [16] Modeling and optimization of the hybrid flow shop scheduling problem with sequence-dependent setup times
    Xue, Huiting
    Meng, Leilei
    Duan, Peng
    Zhang, Biao
    Zou, Wenqiang
    Sang, Hongyan
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (02) : 473 - 490
  • [17] Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources
    Fekri, Masoud
    Heydari, Mehdi
    Mazdeh, Mohammad Mahdavi
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 133
  • [18] Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements
    Seif, Javad
    Yu, Andrew Junfang
    Rahmanniyay, Fahimeh
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3204 - 3225
  • [19] Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time
    Liu, Runze
    Jia, Qi
    Yu, Hui
    Gao, Kaizhou
    Fu, Yaping
    Yin, Li
    MATHEMATICS, 2025, 13 (03)
  • [20] Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
    Malhotra, K.
    Gupta, D.
    Goel, S.
    Tripathi, A. K.
    MALAYSIAN JOURNAL OF MATHEMATICAL SCIENCES, 2022, 16 (03): : 451 - 470