A bi-objective optimization for flow shop group scheduling problem with sequence dependent setup time

被引:0
|
作者
Sekkal, Djazia Nadjat [1 ]
Belkaid, Faycal [1 ]
机构
[1] Univ Tlemcen, Mfg Engn Lab Tlemcen, Tilimsen, Algeria
关键词
A bi-objective approach; flow shop group scheduling; learning effect; makespan; energy consumption;
D O I
10.1109/LOGISTIQUA55056.2022.9938059
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The minimization of makespan as an indicator of productivity and service level by using learning effect and high cadences during the production and transportation of products leads to an increase in energy consumption that has a negative effect on the environment and contributes to climate change. A bi-objective mixed integer linear programming model is developed in order to join the two objectives into one using the LP-metric method. Based on a real case study of the flow shop sequence dependent group scheduling problem, several experiments are carried out using different learning rates and varying the weights of the two objective functions in order to support the decision-maker in his operational and tactical choices.
引用
收藏
页码:560 / 566
页数:7
相关论文
共 50 条
  • [21] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    Anjana, V.
    Sridharan, R.
    Kumar, P. N.
    JOURNAL OF SCHEDULING, 2020, 23 (01) : 49 - 69
  • [22] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    V. Anjana
    R. Sridharan
    P. N. Ram Kumar
    Journal of Scheduling, 2020, 23 : 49 - 69
  • [23] Bi-objective scheduling for the re-entrant hybrid flow shop with learning effect and setup times
    Mousavi, S. M.
    Mahdavi, I
    Rezaeian, J.
    Zandieh, M.
    SCIENTIA IRANICA, 2018, 25 (04) : 2233 - 2253
  • [24] Adaptive Hybrid Algorithms for the Sequence-Dependent Setup Time Permutation Flow Shop Scheduling Problem
    Li, Xiaoping
    Zhang, Yi
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (03) : 578 - 595
  • [25] Hybrid Flow Shop with Unrelated Machines, Setup Time, and Work in Progress Buffers for Bi-Objective Optimization of Tortilla Manufacturing
    Yaurima-Basaldua, Victor Hugo
    Tchernykh, Andrei
    Villalobos-Rodriguez, Francisco
    Salomon-Torres, Ricardo
    ALGORITHMS, 2018, 11 (05):
  • [26] Comparison of Heuristic for Flow Shop Scheduling Problems with Sequence Dependent Setup time
    Kaweegitbundit, Parinya
    ADVANCED MANUFACTURING SYSTEMS, 2011, 339 : 332 - 335
  • [27] Multi-objective distributed reentrant permutation flow shop scheduling with sequence-dependent setup time
    Rifai, Achmad Pratama
    Mara, Setyo Tri Windras
    Sudiarso, Andi
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 183
  • [28] A Bi-Objective Model for a Stage Shop Scheduling Problem with HumanRobot Collaboration
    Ghasemkhani, Ahmad
    Tavakkoli-Moghaddam, Reza
    Hamid, Mahdi
    Nasiri, Mohammad Mahdi
    IFAC PAPERSONLINE, 2022, 55 (10): : 1290 - 1295
  • [29] RNN Modelling for Bi-objective MPM Job Shop Scheduling Problem
    Tselios, Dimitrios
    Savvas, Ilias
    Kechadi, M-Tahar
    2013 FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE, COMMUNICATION SYSTEMS AND NETWORKS (CICSYN), 2013, : 13 - 18
  • [30] Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem
    Seidgar, Hany
    Zandieh, Mostafa
    Mahdavi, Iraj
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 404 - 425