A Bi-objective green tugboat scheduling problem with the tidal port time windows

被引:19
|
作者
Zhong, Huiling [1 ]
Zhang, Yugang [1 ]
Gu, Yimiao [1 ]
机构
[1] South China Univ Technol, Dept Elect Business, Guangzhou, Peoples R China
关键词
Green tugboat scheduling; Time windows; Multi-objective optimization; Non-dominated sorting genetic algorithm II; QUAY CRANE ASSIGNMENT; MULTIOBJECTIVE OPTIMIZATION; BERTH ALLOCATION; ALGORITHM;
D O I
10.1016/j.trd.2022.103409
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Tugboat assistance is essential when large ships are berthing and unberthing, and requires ports to produce efficient tugboat schedules considering various constraints. Few studies optimize tugboat scheduling from multiple vectors simultaneously, however. This paper thus constructs a bi-objective, mixed-integer linear programming, green tugboat scheduling model in order to minimize the maximum completion time and total fuel consumption, which improves port service levels, decreases tugboat company operating expenditures and thus environmental pollution emissions. The proposed model also considers the time window characteristics of the tidal port. We use the non-dominated sorting genetic algorithm II (NSGA-II) framework integrating the characteristics of tugboat scheduling to solve the model. Finally, we make a case study about Guangzhou Port to validate the model and the algorithm via a comparison of results solved by NSGA-II and CPLEX solver. The Pareto fronts obtained show the trade-off relationship between the two objectives, and provide a basis for port tugboat scheduling plans.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Bi-objective routing problem with asymmetrical travel time distributions
    Zhang, Xu
    Chen, Mei
    JOURNAL OF INTELLIGENT TRANSPORTATION SYSTEMS, 2018, 22 (02) : 87 - 98
  • [42] Surgical case scheduling problem with fuzzy surgery time: An advanced bi-objective ant system approach
    Behmanesh, Reza
    Zandieh, Mostafa
    KNOWLEDGE-BASED SYSTEMS, 2019, 186
  • [43] Bi-objective resource-constrained project scheduling problem with time-dependent resource costs
    Alcaraz, Javier
    Anton-Sanchez, Laura
    Saldanha-da-Gama, Francisco
    JOURNAL OF MANUFACTURING SYSTEMS, 2022, 63 : 506 - 523
  • [44] Approximation algorithms for bi-objective parallel-machine scheduling in green manufacturing
    Jiang, Yiwei
    Tang, Xuelian
    Li, Kai
    Cheng, T. C. E.
    Ji, Min
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 176
  • [45] An exact method to solve a Bi-objective Resource Constraint Project Scheduling Problem
    Wan, Xixi
    Dugardin, Frederic
    Yalaoui, Farouk
    IFAC PAPERSONLINE, 2016, 49 (12): : 1038 - 1043
  • [46] An Immune-PSO Algorithm for Bi-objective Flow Shop Scheduling Problem
    Chang Junlin
    Liang Junyan
    Wei Wei
    2011 30TH CHINESE CONTROL CONFERENCE (CCC), 2011, : 2115 - 2118
  • [47] Multi-threaded simulated annealing for a bi-objective maintenance scheduling problem
    Safaei, Nima
    Banjevic, Dragan
    Jardine, Andrew K. S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (01) : 63 - 80
  • [48] Multi-objective Path Relinking Algorithm for Solving Bi-objective Flowshop Scheduling Problem
    Zeng, Rong-Qiang
    Basseur, Matthieu
    Xue, Li-Yuan
    ADVANCED INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS, PT I, ICIC 2024, 2024, 14862 : 159 - 168
  • [49] Bi-objective approaches for home healthcare medical team planning and scheduling problem
    Ming Liu
    Dapeng Yang
    Qiang Su
    Lujun Xu
    Computational and Applied Mathematics, 2018, 37 : 4443 - 4474
  • [50] Bi-objective multi-resource scheduling problem for emergency relief operations
    Bodaghi, Behrooz
    Palaneeswaran, Ekambaram
    Abbasi, Babak
    PRODUCTION PLANNING & CONTROL, 2018, 29 (14) : 1191 - 1206