A Bi-objective green tugboat scheduling problem with the tidal port time windows

被引:19
|
作者
Zhong, Huiling [1 ]
Zhang, Yugang [1 ]
Gu, Yimiao [1 ]
机构
[1] South China Univ Technol, Dept Elect Business, Guangzhou, Peoples R China
关键词
Green tugboat scheduling; Time windows; Multi-objective optimization; Non-dominated sorting genetic algorithm II; QUAY CRANE ASSIGNMENT; MULTIOBJECTIVE OPTIMIZATION; BERTH ALLOCATION; ALGORITHM;
D O I
10.1016/j.trd.2022.103409
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Tugboat assistance is essential when large ships are berthing and unberthing, and requires ports to produce efficient tugboat schedules considering various constraints. Few studies optimize tugboat scheduling from multiple vectors simultaneously, however. This paper thus constructs a bi-objective, mixed-integer linear programming, green tugboat scheduling model in order to minimize the maximum completion time and total fuel consumption, which improves port service levels, decreases tugboat company operating expenditures and thus environmental pollution emissions. The proposed model also considers the time window characteristics of the tidal port. We use the non-dominated sorting genetic algorithm II (NSGA-II) framework integrating the characteristics of tugboat scheduling to solve the model. Finally, we make a case study about Guangzhou Port to validate the model and the algorithm via a comparison of results solved by NSGA-II and CPLEX solver. The Pareto fronts obtained show the trade-off relationship between the two objectives, and provide a basis for port tugboat scheduling plans.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] A simheuristic for bi-objective stochastic permutation flow shop scheduling problem
    Maria Gonzalez-Neira, Eliana
    Rafael Montoya-Torres, Jairo
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 57 - 80
  • [32] A Lexicographic Bi-objective Scheduling Problem From Steel Production Systems
    Zhao, Ziyan
    Zhou, MengChu
    Liu, Shixin
    Guo, Xiwang
    Liu, Haoyue
    IFAC PAPERSONLINE, 2020, 53 (05): : 158 - 163
  • [33] A Bi-Objective Model for a Stage Shop Scheduling Problem with HumanRobot Collaboration
    Ghasemkhani, Ahmad
    Tavakkoli-Moghaddam, Reza
    Hamid, Mahdi
    Nasiri, Mohammad Mahdi
    IFAC PAPERSONLINE, 2022, 55 (10): : 1290 - 1295
  • [34] Bi-objective Optimization for the Vehicle Routing Problem with Time Windows: Using Route Similarity to Enhance Performance
    Garcia-Najera, Abel
    Bullinaria, John A.
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION: 5TH INTERNATIONAL CONFERENCE, EMO 2009, 2009, 5467 : 275 - 289
  • [35] RNN Modelling for Bi-objective MPM Job Shop Scheduling Problem
    Tselios, Dimitrios
    Savvas, Ilias
    Kechadi, M-Tahar
    2013 FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE, COMMUNICATION SYSTEMS AND NETWORKS (CICSYN), 2013, : 13 - 18
  • [36] Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem
    Chen, Xiaopan
    Kong, Yunfeng
    Dang, Lanxue
    Hou, Yane
    Ye, Xinyue
    PLOS ONE, 2015, 10 (07):
  • [37] A bi-objective optimisation approach for the critical chain project scheduling problem
    Peng, Wuliang
    Lin, Jiali
    Ma, Xueli
    INTERNATIONAL JOURNAL OF COMPUTING SCIENCE AND MATHEMATICS, 2021, 13 (04) : 311 - 330
  • [38] Bi-objective cyclic scheduling in a robotic cell with processing time windows and non-Euclidean travel times
    Feng, Jianguang
    Che, Ada
    Wang, Nengmin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (09) : 2505 - 2518
  • [39] Green Traveling Purchaser Problem Model: A Bi-Objective Optimization Approach
    Hamdan, Sadeque
    Larbi, Rim
    Cheaitou, Ali
    Alsyouf, Imad
    2017 7TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION, AND APPLIED OPTIMIZATION (ICMSAO), 2017,
  • [40] Bi-objective grey wolf optimization algorithm combined Levy flight mechanism for the FMC green scheduling problem
    Zhou, Binghai
    Lei, Yuanrui
    APPLIED SOFT COMPUTING, 2021, 111