Bi-objective single machine scheduling problem with stochastic processing times

被引:13
|
作者
Salmasnia, Ali [1 ]
Khatami, Mostafa [2 ]
Kazemzadeh, Reza Baradaran [2 ]
Zegordi, Seyed Hessameddin [2 ]
机构
[1] Univ Qom, Fac Engn & Technol, Dept Ind Engn, Qom, Iran
[2] Tarbiat Modares Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Scheduling; Stochastic programming; Goal programming; Single machine; Mean completion time; Earliness and tardiness costs; TARDINESS PENALTIES; ASYMMETRIC EARLINESS; TARDY JOBS; DUE-DATE; COSTS; NUMBER;
D O I
10.1007/s11750-014-0337-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, a static single machine scheduling problem is investigated, where processing times are stochastic, due dates are deterministic and inserted idle time is allowed. Two objective functions are simultaneously taken into account, minimization of mean completion time and minimization of earliness and tardiness costs. A robust model is presented to tackle the problem, based on goal programming and a stochastic programming model named E-model. The proposed model not only obtains optimal operating systems, but also considers the variance of the objective functions and the correlation between them. Moreover, chance-constrained programming model is used to take into account the randomness in the constraints of the model. The model is presented with general distribution of processing times and the normal case is explored in experiments. Two sets of computational experiments are presented to test the efficiency of the proposed model. In the first set, the performance obtained by the bi-objective formulation is measured, where in the second set the performance obtained by incorporating robustness is measured. Results confirm the effectiveness of the proposed model, in both directions.
引用
收藏
页码:275 / 297
页数:23
相关论文
共 50 条
  • [1] Bi-objective single machine scheduling problem with stochastic processing times
    Ali Salmasnia
    Mostafa Khatami
    Reza Baradaran Kazemzadeh
    Seyed Hessameddin Zegordi
    [J]. TOP, 2015, 23 : 275 - 297
  • [2] A bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach
    Zarandi, M. H. Fazel
    Kayvanfar, Vahid
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4): : 545 - 563
  • [3] A bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach
    M. H. Fazel Zarandi
    Vahid Kayvanfar
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 77 : 545 - 563
  • [4] Risk level-driven bi-objective stochastic parallel machine scheduling problem
    Liu, Ming
    Liu, Xin
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 869 - 874
  • [5] Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times
    Yang, Xin
    Zeng, Zhenxiang
    Wang, Ruidong
    Sun, Xueshan
    [J]. PLOS ONE, 2016, 11 (12):
  • [6] Bi-objective Optimization in Identical Parallel Machine Scheduling Problem
    Bathrinath, Sankaranarayanan
    Sankar, S. Saravana
    Ponnambalam, S. G.
    Kannan, B. K. V.
    [J]. SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, PT I (SEMCCO 2013), 2013, 8297 : 377 - 388
  • [7] Toward an Efficient Resolution for a Single-machine Bi-objective Scheduling Problem with Rejection
    Moghaddam, Atefeh
    Teghem, Jacques
    Tuyttens, Daniel
    Yalaoui, Farouk
    Amodeo, Lionel
    [J]. FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2019, 44 (02) : 179 - 211
  • [8] Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration
    Wang, Shijin
    Liu, Ming
    Chu, Feng
    Chu, Chengbin
    [J]. JOURNAL OF CLEANER PRODUCTION, 2016, 137 : 1205 - 1215
  • [9] Bi-objective optimisation for integrated scheduling of single machine with setup times and preventive maintenance planning
    Wang, Shijin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3719 - 3733
  • [10] A simheuristic for bi-objective stochastic permutation flow shop scheduling problem
    Maria Gonzalez-Neira, Eliana
    Rafael Montoya-Torres, Jairo
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 57 - 80